Similar Projects
Entergy Beaumont Service Center Phase I
New Construction - 70,773 SF
Design
$20,000,000 est. value
Beaumont, TX 77708

Food Court Facility Building 2
New Construction, Infrastructure - 6,090 SF
Design
$500,000 CJ est. value
Port Arthur, TX 77642

Grain Dock Replacement Project
Infrastructure
Bidding
$700,000 CJ est. value
Beaumont, TX 77702

SS 215 - Rehabilitation of Existing Roadway
Infrastructure
Bidding
$1,085,880 CJ est. value
Beaumont, TX 77705

Contract to Construct an Equipment Storage Cover Addition at the City Water Reclamation Facility
New Construction
Post-Bid
Beaumont, TX 77705

Construction of the Exxon Mobile Intake Structure
Infrastructure
Post-Bid
Beaumont, TX

Site Preparation - Nederland, Texas
Alteration
Results
$24,046 est. value
Nederland, TX 77627

Hazard Elimination and Safety
Infrastructure
Results
$850,170 CJ est. value
Beaumont, TX 77705

Howard Energy Services DGD Unit Warehouse
New Construction, Infrastructure - 10,000 SF
Pending Verification
$2,700,000 CJ est. value
Port Arthur, TX 77640

Howard Energy Services DGD Unit Warehouse
New Construction, Infrastructure - 10,000 SF
Pending Verification
$2,700,000 CJ est. value
Port Arthur, TX 77640

Food Court Facility
New Construction, Infrastructure - 6,040 SF
Design
$2,500,000 CJ est. value
Port Arthur, TX 77642

US 69 - Mill and Inlay
Infrastructure
Bidding
$1,612,673 CJ est. value
Beaumont, TX 77705

Construction of Storage Building at Transit Fueling Station
New Construction
Post-Bid
Port Arthur, TX 77640

US 69 - Surfacing / Roadway Restoration
Infrastructure
Results
$10,175,549 CJ est. value
Beaumont, TX 77705

Volco / Beaumont
New Construction, Infrastructure - 8,700 SF
Pending Verification
$550,000 CJ est. value
Beaumont, TX 77707

Last Updated 08/24/2022 08:05 AM
Project Title

Construction of Storage Building at Transit Fueling Station

Physical Address View project details and contacts
City, State (County) Port Arthur, TX 77640   (Jefferson County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Site Development, Warehouse/Storage
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $250,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

https://www.tdlr.texas.gov/TABS/Search/Project/TABS2022013628 Project Name: Storage Building Project Number: TABS2022013628 Facility Name: Transit Fueling Station Location Address: 325 Dallas Port Arthur, TX 77640 Location County: Jefferson Start Date: 4/1/2022 Completion Date: 10/30/2022 Estimated Cost: $225,000 Type of Work: New Construction Type of Funds: This project involves public funds, public land, or is a Federally funded roadway project. Scope of Work: Metal storage building Square Footage: 1,131 ft 2 ________________________________ Sealed Bid submittals must be received and time stamped by Central Standard (The clock located in the City Secretary's office will be the official time.) All bids received will be read aloud at in the City Council Chambers, City Hall, 5th Floor, Port Arthur, TX. You are invited to attend. Questions concerning the Invitation to Bid or Scope of Work should be directed in writing to: City of Port Arthur, TX Clifton Williams, Purchasing Manager P.O. Box 1089 Port Arthur, TX 77641 clifton.williams@portarthurtx.gov The enclosed Invitation to Bid (ITB) and accompanying General Instructions, Conditions and Specifications are for your convenience in submitting bids for the enclosed referenced services for the City of Port Arthur. Bids must be signed by a person having authority to bind the firm in a contract. Bids shall be placed in a sealed envelope, with the Vendor's name and address in the upper left-hand corner of the envelope. All Bids Must Be Received in the City Secretary's Office Before Opening Date and Time. It is the sole responsibility of the firm to ensure that the sealed ITB submittal arrives at the above location by specified deadline regardless of delivery method chosen by the firm. Faxed or electronically transmitted ITB submittals will not be accepted. The purpose of the Pre-Bid Conference is to make certain that the scope of work is fully understood, to answer any questions, to clarify the intent of the Contract Documents, and to resolve any problems that may affect the project construction. No addendum will be issued at this meeting, but subsequent thereto, the Purchasing Manager, if necessary, will issue an addendum(s) to clarify the intent of the Contract Documents. 9% DBE participation Location- 325 Dallas Ave Port Arthur, TX 77640

Details

1,131 SF.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Metal Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Door Hardware.
Division 09 - Finishes, Flooring.
Division 10 - Specialties, Signage, Flagpoles.
Division 11 - Equipment, Parking Control Equipment.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical, Lighting, Interior Lighting, Exterior Lighting.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents