Similar Projects
St. Andrew's School Conversion
Renovation
Conception
Bayonne, NJ

Construction of Additional Elementary School Classrooms
Renovation, Addition
Conception
Westwood, NJ

Toilet Room Renovation At Central Elementary School
Renovation
Design
$200,000 CJ est. value
Haddonfield, NJ 08033

2022 Bond - Middlesex Borough School District
Renovation, Infrastructure
Design
$9,000,000 est. value
Middlesex, NJ

Toilet Room Renovations at J. Fithian Elementary School
Renovation
Bidding
$200,000 CJ est. value
Haddonfield, NJ 08033

Toilet Room Renovations at Elizabeth Haddon Elementary School
Renovation
Bidding
$200,000 CJ est. value
Haddonfield, NJ 08033

Interior Upgrades Phase 3 at Grace N. Rogers Elementary school
Renovation
Post-Bid
$1,200,000 est. value
East Windsor, Hightstown, NJ 08520

Construction Management Services
New Construction, Term Contract
Post-Bid
Willingboro, NJ

Electrical Service Upgrade at Frank Gavlak ES
Alteration
Results
Wallington, NJ 07057

Courtyard Project at Lawrence Brook Elementary School
Infrastructure
Results
$99,590 CJ est. value
East Brunswick, NJ 08816

Princeton Charter School
Addition - 25,579 SF
Construction
$4,000,000 est. value
Princeton, NJ 08540

Toilet Renovations at Belleville Elementary Schools 3, 5, 7, 8, 9, 10 and Belleville Middle School
Renovation - 51,275 SF
Construction
$2,280,000 est. value
Belleville, NJ 07109

Sadhu Vaswani Center
Demolition, New Construction, Infrastructure
Pending Verification
$2,000,000 CJ est. value
Milltown, NJ 08850

New Avenel Elementary School - Woodbridge Township School District
New Construction, Infrastructure
Pending Verification
$20,000,000 CJ est. value
Avenel, NJ 07001

ARP Outdoor Classrooms
New Construction
Conception
Lawrence Township, NJ 08648

Last Updated 01/10/2023 11:34 PM
Project Title

Door Replacement at Central Elementary School

Physical Address View project details and contacts
City, State (County) Warren, NJ 07059   (Somerset County)
Category(s) Education
Sub-Category(s) Elementary School
Contracting Method Competitive Bids
Project Status Results, Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $262,900 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

As of December 5, 2022, the project has not been awarded. A timeline for award has not been confirmed. Warren Township Board of Education Door Replacement at Warren CS PAS 8707CS Bids, utilizing the bid forms as prepared by the Architect, may be submitted in person, by mail or delivery service prior to that time. Any bid submitted by mail or delivery service is done so at the sole risk of the bidder. No Bids will be received by facsimile or electronic transmission. It is expressly understood that the bidder is responsible for getting the bid proposals to the Business Administrator prior to the time and date set for the bid opening. Any bid received after the closing time will be returned unopened. If any restrictions on the format of the Bid Opening are in place due to governmental orders or guidelines regarding the ongoing health emergency, information about the format and possible restriction of attendance will be posted on the District website. Contractors shall abide by any and all Executive Order(s) pertaining to safety precautions required as a result of Coronavirus disease 2019 (COVID-19). Bidders must email their request at least twenty-four (24) hours or one (1) business day in advance to gain access to bid documents as a registered plan holder. Project information is also available on the Architect's website, http://www.planetpsa.com/bids. Pursuant to NJSA 18A:18A-21( c)(2), Addenda shall be provided no later than seven days, Saturdays, Sundays, or holidays excepted, prior to the date for acceptance of bids, to any person who has submitted a bid or who has received a bid package, by one of the listed means in the law, and additionally as posted to the FTP site containing the bid documents. Questions will be considered only up until the inquiry deadline stated in the Instructions to Bidders. The scope of this project includes, but is not limited to, the replacement of interior wood doors with new wood door frames and hardware. Bids will be considered in accordance with N.J.S.A. 18A:18A-1 et.seq. and N.J.S.A. 18A:7G-1 et.seq. Bids will be received from a Bidder for one price for the entire project, all trades, all inclusive. Bidders must be pre-qualified by the New Jersey Department of Treasury, Division of Property Management and Construction (DPMC) in one of the following categories, pursuant to N.J.S.A. 18A:18A-27.1, et.seq.: (C008) GENERAL CONSTRUCTION or (C009) GENERAL CONSTRUCTION / ALTERATIONS / ADDITIONS or (C011) DOORS AND HARDWARE Bidders shall also either be prequalified for, or include documentation for prequalified subcontractors for, the following classifications: (C011) DOORS AND HARDWARE Bidders and subcontractors for each of the major branches of work specified in N.J.S.A. 18A:18A-18 must be prequalified by the DPMC. Bidders shall submit a Certificate of Prequalification/Classification from the New Jersey Department of Treasury, Division of Property Management and Construction (DPMC) and Affidavit as to the Total Amount of Uncompleted Contracts for the Bidder and for all subcontractors for whom DPMC prequalification is required. No modifications to the enclosed Instructions to Bidders, General Conditions, Supplemental Conditions or Specifications will be permitted prior to bid acceptance except as may be allowed by addenda as outlined in the Specifications. Bids that propose modifications to the requirements shall result in rejection of the bid as being non-responsive. All bidders are required to comply with the requirements of N.J.S.A. 10:5-31 et seq., Affirmative Action Against Discrimination (N.J.A.C. 17:27-1 et seq.). An Initial Project Workforce Report will be required from the successful Contractor. (Form AA-201). Statement of Ownership Requirement: Pursuant to N.J.S.A. 52:25-24.2, Bidders shall submit a statement setting forth the names and addresses of all persons and entities that own ten percent or more of its stock or interest of any type at all levels of ownership. Bidders and all subcontractors are required to comply with the Public Works Contractor Registration Act, (N.J.S.A. 34:11-56.48 et seq.) and to possess current certification from the Division of Wage and Hour Compliance in the Department of Labor and Workforce Development at the time the bid is submitted. Bidders and all subcontractors for whom DPMC prequalification is required are also required to submit a Business Registration Certificate issued by the Division of Revenue in the New Jersey Department of Treasury prior to contract award. All Bidders are required to submit with the bid, an affidavit by the Bidder that the Bidder is not, at the time of the bid, included on the New Jersey State Treasurer's List or the Federal Government List of Debarred, Suspended or Disqualified Firms or individuals pursuant to NJSA 52:32-44.1, N.J.A.C. 17:19-4 and N.J.A.C. 19:38A-4. Then, prior to contract award, the successful Bidder will be required to submit separate certification that all entities having controlling interest are not on the federal list of debarred contractors. All Bidders are required to complete and submit, prior to contract award, a Disclosure of Investment Activities in Iran Form in accordance with N.J.S.A 52:32-58 and N.J.S.A. 18A:18A-49.4. The successful bidder will be required to furnish additional bonds as specified in Document 00 21 13, "Instructions to Bidders." The Warren Township Board of Education reserves the right to reject all bids, to waive minor immaterial defects in any bid, or to award a lump sum contract, in accordance with applicable laws, including the requirements of the Public School Contracts Law at N.J.S.A. 18A:18A-1 et seq. No bid may be withdrawn for a period of sixty (60) days after the opening date. The Contract will be awarded to the lowest responsible bidder as defined in N.J.S.A. 18A:18A-2(t) and N.J.S.A. 18A:18A-18 (c), as applicable.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Educational and Scientific Equipment, Audio-Visual Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Casework, Countertops, Office Furniture, Institutional Furniture, Classroom Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Common Work Results for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents