Similar Projects
Last Updated | 01/24/2020 12:04 PM |
Project Title | Driscoll Building EMS Access Control Phase II EMS |
Physical Address | View project details and contacts |
City, State (County) | Brentwood, NH (Rockingham County) |
Category(s) | Single Trades |
Sub-Category(s) | Security/Communications |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Extension of the campus wide access control system for up to 48 +/to/from doors located in the Driscoll Building of the Rockingham County Rehabilitation and Nursing Center. Contractor will furnish, install and test the Access Control system components including cables, connectors, Wireless Prox card reader, access control software licenses, door contact, request to exit (REX), suppmt devices, UPS and all other materials necessary to provide a complete, operation and tested Access Control system. Access Control system shall be connected to the owner's existing RS2 ACS network and must be configured as such with the owner's provided network settings. |
||||
Details |
|
||||
Bidder's List | View project details and contacts | ||||
Prospective Bidders | View project details and contacts | ||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |