Similar Projects
Section 5 - Cell 1 Reclaimed Area Liner Construction - Broome County
Infrastructure
Conception
$13,000,000 CJ est. value
Binghamton, NY 13901

Reconstruct Runway Safety Area Runway 34 EMAS Phase II - Broome County
Infrastructure
Conception
$3,000,000 CJ est. value
Johnson City, NY 13790

I-88 Invert Paving, Towns of Colesville and Bainbridge, Broome and Chenango Counties
Infrastructure
Design
$2,600,000 CJ est. value
Colesville, NY 13787

The Retreat at Bunn Hill
New Construction, Infrastructure
Design
$62,000,000 CJ est. value
Vestal, NY 13850

Hinman and CIW Court Resurfacing
Infrastructure
Bidding
$100,000 CJ est. value
Binghamton, NY 13902

Donna Dr Asbestos Abatement
Term Contract, Infrastructure
Bidding
$50,000 CJ est. value
Vestal, NY 13850

Town Hall Storm Water Control
Infrastructure
Post-Bid
$700,000 CJ est. value
Town of Union, NY 13760

Contract No. 1 - Pedestrian Safety Improvement Project
Infrastructure
Post-Bid
$24,500 CJ est. value
Binghamton, NY 13905

Bearcat Sports Complex Site Work for Turf Installation
Infrastructure
Results
Binghamton, NY 13902

300 Block N. Adams Avenue Street Reconstruction Jenkins to Pine Street
Infrastructure
Results
$133,574 CJ est. value
Endicott, NY 13760

Court Street Mixed-Use Development
New Construction, Infrastructure
Pending Verification
$6,000,000 CJ est. value
Binghamton, NY 13901

Glidepath Battery Storage Facility
New Construction, Infrastructure
Pending Verification
$500,000 CJ est. value
Endwell, NY 13760

Broome County Community College - Roadway / Parking Lot Modification - Broome County
Infrastructure
Conception
$600,000 CJ est. value
Binghamton, NY 13905

Paving Services for Greater Binghamton Health Center
Infrastructure
Design
$600,000 CJ est. value
Binghamton, NY 13904

Broome County Land Bank Corporation Renovations and Reconstruction
Demolition, New Construction, Renovation, Infrastructure
Bidding
$500,000 CJ est. value
Johnson City, NY 13790

Last Updated 05/11/2023 09:46 AM
Project Title

Stratmill Road Water Tank Rehabilitation

Physical Address View project details and contacts
City, State (County) Kirkwood, NY 13904   (Broome County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Storage/Water Tanks
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $220,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Town of Kirkwood Stratmill Road Water Tank Rehabilitation It is the Contractors Responsibility to Meet the Minimum Guidelines of the Occupational Safety and Health Act (O.s.h.a.), in Particular Part 1926, the Safety and Health Regulations for Construction. The Town of Kirkwood Has the Authority to Issue a Stop Work Order if the Applicable O.s.h.a. Regulations Are Violated. The Stop Work Order Will Remain in Effect Until Such Violations of the O.s.h.a Regulations Have Been Rectified. Bidders Submitting Bid Proposals for This Work Hereby Acknowledge the Following: Each Laborer, Workman, or Mechanic Employed by the Contractor, Subcontractor, or Other Person About or Upon the Work Under This Contract, Shall Be Paid Not Less Than the Prevailing Rate of Wages, and Shall Be Paid for or Provided the Supplements Not Less Than the Prevailing Supplements as Determined by the New York State Department of Labor, Pursuant to Article 8 of the New York State Labor Law. The Prevailing Rate Schedule, as Determined by the New York State Department of Labor (Prc# 2023000153 Stratmill Rd. The Prime Contractor Shall Be Responsible for the Submission of Copies of Payrolls of All Subcontractors. The Bidder Agrees That This Bid Shall Be Good and May Not Be Withdrawn for a Period of 30 Calendar Days After the Scheduled Closing Time for Receiving Bids. The Town Will Award the Bid Within 30 Days After the Scheduled Closing Time for Receiving Bids. The Town Reserves the Right to Reject Any and All Bids and to Award the Contract in the Best Interests of the Town of Kirkwood, New York. CONTRACT DESCRIPTION A. Work of the Project includes repair and repainting of a 1.15 million gallon above ground concrete water storage tank within the Town of Kirkwood, New York. B. The work consists of furnishing all labor, equipment, and material and performing all operations in strict conformance with the Project Manual dated January 5, 2023, for the Stratmill Road Water Tank Rehabilitation. All questions about the meaning or intent of the Bidding Documents should be emailed to John Mastronardi, P.E. at jmastronardi@griffithsengineering.com. Interpretations or clarifications considered necessary by Engineer in response to such questions will be issued by Addenda e-mailed to all parties having received the Bidding Documents. Questions received less than two days prior to the date for opening of Bids may not be answered. Only questions answered by formal written Addenda will be binding. Oral and other interpretations or clarifications will be without legal effect

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents