Similar Projects
El Cajon Branch Library
New Construction, Infrastructure
Conception
$30,300,000 est. value
El Cajon, CA 92020

RFP - Pavement Condition Assessment
Term Contract
Conception
San Diego, CA 92101

Construct Rumble Strips on Both Shoulders, Rehabilitate Bike Path, and Install Fiber Optic Cable/closed Circuit Television (Cctv)
Infrastructure
Design
$7,535,000 CJ est. value
San Diego, CA 92101

Construct Rumble Strips on Both Shoulders, Rehabilitate Bike Path, and Install Fiber Optic Cable/closed Circuit Television (Cctv)
Infrastructure
Design
$7,535,000 CJ est. value
San Diego, CA 92101

Bermuda Avenue Coastal Access Replacement
Infrastructure
Bidding
$1,290,000 CJ est. value
San Diego, CA 92107

Bermuda Avenue Coastal Access Replacement
Infrastructure
Bidding
$1,290,000 CJ est. value
San Diego, CA 92107

Street Preventive Maintenance
Alteration
Post-Bid
$420,000 est. value
Coronado, CA

Manila Highway 255 Shared Use Path
Alteration
Post-Bid
$888,055 est. value

ADP Airside Improvements
New Construction, Renovation, Infrastructure, Alteration
Results
$270,000,000 est. value
San Diego, CA

Reconstruct and Line Culverts, and Replace Invert Concrete Paving
Infrastructure
Results
$7,000,000 est. value
CA

Oceanside Fire Station #1
Demolition, New Construction, Infrastructure
Construction
$13,579,000 CJ est. value
Oceanside, CA 92054

Nestor Field
Infrastructure
Construction
$122,124 CJ est. value
San Diego, CA 92154

TopGolf / Port of San Diego
New Construction, Infrastructure
Pending Verification
$30,000,000 CJ est. value
San Diego, CA 92101

Chula Vista Bayfront Parks - Sweetwater Park
Infrastructure, Renovation
Pending Verification
$12,000,000 CJ est. value
Chula Vista, CA 91910

Carmel Mountain Road Fire Station - San Diego Fire-Rescue Department
New Construction, Infrastructure
Conception
$12,000,000 CJ est. value
San Diego, CA 92129

Last Updated 08/21/2022 11:34 PM
Project Title

Miramar Landfill Storm Water Basin Improvements

Physical Address View project details and contacts
City, State (County) San Diego, CA 92111   (San Diego County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Shoreline/Erosion/Drainage, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected June 2022
Bids Due View project details and contacts
Estimated Value $266,200 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Bid Valid 120 Calendar Days Liquidated Damages $1,000 Per Day 1. SCOPE OF WORK: a) Mobilization. b) Hawthorne Basin work includes demolition of the existing gravel road, riprap drainage channel, down drain termination structure, and clearing and grubbing. Following demolition, the Hawthorne Basin will be excavated and a concrete lined earthen embankment, spillway, skimmer, outlet structure, and culvert will be installed. A new 36" HDPE down drain, inlet protection, and Type 2 energy dissipater will also be installed at a location further upstream of the basin. A new Type 2 energy dissipater will also be installed at the termination of the existing 36" CMP down drain. c) West Basin Skimmer/Pump System includes installation of a floating pump/skimmer with driven piles, diesel generator, and gravel staging pad. d) East Basin expansion work includes removal and salvage of the existing Type 2 energy dissipater, metal down drain flume, and a section of a 36" CMP storm drain; demolition of the existing standpipe, trash rack, and clearing and grubbing. Following demolition, the East Basin will be expanded and the Type 2 energy dissipater and metal down drain flume will be re-installed. A new outlet structure and skimmer will also be installed. e) Areas identified as erosion control areas will be stabilized with vegetation through soil preparation and application of hydraulically applied stabilizers (hydroseed and hydromulch). Straw wattle slope interruption devices will also be installed. f) Grade, moisture condition soil, and apply hydro-seed and hydraulic mulch in disturbed areas at Project Close-Out as indicated on Construction Drawings. g) Contract close-out and de-mobilization. 1.1 The Work shall be performed in accordance with: 1.1.1 The Notice Inviting Bids and Plans numbered 42120-01-D through 42120-17-D, inclusive. Other Details 1.9. Contractor and Subcontractor Registration Requirements. This project is subject to compliance monitoring and enforcement by the DIR. A contractor or subcontractor shall not be qualified to bid on, be listed in a bid or proposal, subject to the requirements of section 4104 of the Public Contract Code, or engage in the performance of any contract for public work, unless currently registered and qualified to perform public work pursuant to Labor Code section 1725.5 It is not a violation of this section for an unregistered contractor to submit a bid that is authorized by Section 7029.1 of the Business and Professions code or by Section 10164 or 20103.5 of the Public Contract Code, provided the contractor is registered to perform public work pursuant to Section 1725.5 at the time the contract is awarded. 1.9.1. A Contractor's inadvertent error in listing a subcontractor who is not registered pursuant to Labor Code section 1725.5 in response to a solicitation shall not be grounds for filing a bid protest or grounds for considering the bid non-responsive provided that any of the following apply: (1) the subcontractor is registered prior to bid opening; (2) within twenty-four hours after the bid opening, the subcontractor is registered and has paid the penalty registration fee specified in Labor Code section 1725.5; or (3) the subcontractor is replaced by another registered subcontractor pursuant to Public Contract Code section 4107. 1.9.2. By submitting a bid or proposal to the City, Contractor is certifying that he or she has verified that all subcontractors used on this public work project are registered with the DIR in compliance with Labor Code sections 1771.1 and 1725.5, and Contractor shall provide proof of registration for themselves and all listed subcontractors to the City at the time of bid or proposal due date or upon request. Notes 7. SUBCONTRACTING PARTICIPATION PERCENTAGES: Subcontracting participation percentages apply to this contract. 7.1. The City has incorporated mandatory SLBE-ELBE subcontractor participation percentages to enhance competition and maximize subcontracting opportunities. For the purpose of achieving the mandatory subcontractor participation percentages, a recommended breakdown of the SLBE and ELBE subcontractor participation percentages based upon certified SLBE and ELBE firms has also been provided to achieve the mandatory subcontractor participation percentages: 1. SLBE participation 5.4% 2. ELBE participation 6.9% 3. Total mandatory participation 12.3% 7.2. The Bid may be declared non-responsive if the Bidder fails to meet the following requirements: 7.2.1. Include SLBE-ELBE certified subcontractors at the overall mandatory participation percentage identified in this document; OR 7.2.2. Submit Good Faith Effort (GFE) documentation, saved in searchable Portable Document Format (PDF), demonstrating the Bidder made a good faith effort to conduct outreach to and include SLBE-ELBE Subcontractors as required in this solicitation by 5 PM 3 Working Days after the Bid opening if the overall mandatory participation percentage is not me. All submittals in searchable PDF shall be submitted electronically within the prescribed time identified in the contract documents via PlanetBids by invitation to the point of contact named in the bid provided by the Contract Specialist to all bidders. Special Notices Local Programs & Policies THIS CONTRACT WILL BE SUBJECT TO THE FOLLOWING: - THE CITY'S SUBCONTRACTING PARTICIPATION REQUIREMENTS FOR SLBE PROGRAM - PREVAILING WAGE RATES: STATE - APPRENTICESHIP

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 34 - Transportation, Operation and Maintenance of Transportation.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents