Similar Projects
Saint Leo University Mixed Use Development
New Construction, Infrastructure
Conception
$20,000,000 CJ est. value
Saint Leo, FL 33574

Saint Leo University Mixed Use Development
New Construction, Infrastructure
Conception
$20,000,000 CJ est. value
Saint Leo, FL 33574

South 19 Avenue Aparments
New Construction, Infrastructure - 13,120 SF
Design
$6,800,000 CJ est. value
Hollywood, FL 33020

South 19 Avenue Aparments
New Construction, Infrastructure - 13,120 SF
Design
$6,800,000 CJ est. value
Hollywood, FL 33020

AutoZone #3640 / Zephyrhills
New Construction, Infrastructure - 7,381 SF
Post-Bid
$1,500,000 CJ est. value
Zephyrhills, FL 33545

AutoZone #3640 / Zephyrhills
New Construction, Infrastructure - 7,381 SF
Post-Bid
$1,500,000 CJ est. value
Zephyrhills, FL 33545

Paving for Forensic Institute for Research Security and Tactics
Infrastructure
Results
FL

Annual Asphalt Pavement Preservation Program for Paving Assessment and Program
Term Contract
Results
New Port Richey, FL

Charleston At Wesley Chapel
New Construction
Construction
Wesley Chapel, FL

RFP D/B - Design and Construction of Zone 3 - WEG HQ/Maintenance Hangar and Apron Facilities
New Construction, Infrastructure - 211,419 SF
Construction
$195,651,603 CJ est. value
Tyndall AFB, FL 32403

Sanctuary Ridge
New Construction, Infrastructure
Pending Verification
$46,000,000 CJ est. value
Wesley Chapel, FL 33544

Sanctuary Ridge
New Construction, Infrastructure
Pending Verification
$46,000,000 CJ est. value
Wesley Chapel, FL 33544

New K8 School - Pasco County Schools
New Construction, Infrastructure
Conception
$58,000,000 CJ est. value
Land O Lakes, FL 34639

US Wholesale Pipe And Tube
New Construction, Infrastructure - 36,542 SF
Design
$2,000,000 CJ est. value
Holiday, FL 34690

Activity Pool Resurfacing
Infrastructure
Post-Bid
New Port Richey, FL 34653

Last Updated 04/28/2023 12:10 PM
Project Title

Siena Cove - Site Amenities, Swimming Pool, Hardscapes Bid Package

Physical Address View project details and contacts
City, State (County) Wesley Chapel, FL 33544   (Pasco County)
Category(s) Entertainment/Recreation, Heavy and Highway
Sub-Category(s) Clubhouse/Social Club, Paving/Reconstruction, Site Development, Swimming Pool(s)
Contracting Method Bids by Invitation
Project Status Sub-Bidding, Construction start expected August 2023
Bids Due View project details and contacts
Estimated Value $2,000,000 [brand] Estimate
Plans Available from General Contractor
Owner View project details and contacts
Architect View project details and contacts
Description

Direct all bids/inquiries to the general contractor. Site Amenities Package: Swimming Pool, Fountain, & Hardscapes. The only trades that are bidding right now are the Site Amenities Package trades of Swimming Pool, Fountain, & Hardscapes. Notes: 1) Subcontractor Bids are accepted for all Trades 2) Provide bids based on Plans and Specifications provided. Any substitution should be stated clearly on proposal and provided as an alternate price. Estimate = total project construction cost estimate.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Concrete Reinforcing, Concrete Finishing, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating, Special Coatings, Cementitious Coatings.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 13 - Special Construction, Swimming Pools, Recirculating Gutter Systems, Swimming Pool Accessories, Swimming Pool Cleaning Equipment.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures, Pool and Fountain Plumbing Systems, Swimming Pool Plumbing Systems.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Special Purpose Lighting, Underwater Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents