Similar Projects
Improve Sub Basement Plumbing and Air Quality
Renovation
Design
$10,000,000 CJ est. value
Columbus, OH 43215

Lakewood Park - Phase 2 - Parking Lot Improvements
Infrastructure
Bidding
$1,850,000 CJ est. value
Lakewood, OH 44107

Warrensville Heights City School District
Infrastructure
Bidding
$350,000 CJ est. value
Highland Hills, OH 44128

Fire Pump Replacement at Dorrell Manor
Renovation
Sub-Bidding
$200,000 CJ est. value
Toledo, OH 43614

Plumbing Services 2023 Re-Bid
Term Contract
Sub-Bidding
Cleveland, OH 44115

Plumbers for Replacement of Lead Service Lines on Private Property
Alteration
Post-Bid
Cincinnati, OH

Liberty Center Local Schools Varsity Gymnasium Building
Alteration
Post-Bid
Liberty Center, OH 43532

Terry Collins Reentry Center (TCRC) - Plumbing Upgrades Project
Alteration
Results
$315,000 est. value
Chillicothe, OH 45601

Plumbing Services at YMHA Properties
Term Contract
Results
Youngstown, OH

Hickory Chase Cottages
New Construction, Infrastructure
Construction
$20,000,000 CJ est. value
Hilliard, OH 43026

Thompson Park 2-Inch Water Service
Term Contract
Sub-Bidding
Upper Arlington, OH 43220

Replace Domestic Water and Chilled Drinking Water Piping
Alteration
Post-Bid
$2,000,000 to $5,000,000 est. value
Cincinnati, OH 45220

Fairwood and Plumbing Services
Alteration
Results
$5,000 est. value
Columbus, OH 43206

Plumbers for Replacement of Lead Service Lines on Private Property
Term Contract
Post-Bid
$500,000 CJ est. value
Cincinnati, OH 45202

Plumbing Services
Alteration
Results
$50,000 est. value
Columbus, OH 43209

Last Updated 08/07/2023 10:15 PM
Project Title

Oak Pump Station Replacement and Collection System Rehabilitation Project Berlin Lake Mill Creek Recreation Area

Physical Address View project details and contacts
City, State (County) Deerfield, OH 44411   (Portage County)
Category(s) Single Trades
Sub-Category(s) Plumbing
Contracting Method Competitive Bids
Project Status Contract Award, Request for Qualifications, Construction start expected September 2023
Bids Due View project details and contacts
Estimated Value $1,249,758 [brand] Estimate
Plans Available from Agency's Affiliate - 05/23/23
Owner View project details and contacts
Architect View project details and contacts
Description

Berlin Lake Mill Creek Recreation Area Oak Pump Station Replacement and Collection System Rehabilitation Project, Berlin Lake, Mahoning County, Ohio - The U.S. Army Corps of Engineers, Pittsburgh District, is carrying out a project to replace the existing Oak Pump Station and to rehabilitate portions of the existing sanitary sewer collection system at the location referenced above. The major features of the Project generally involves the following:a. Demolition and proper disposal of the existing Oak Pump Station and installation of a new, pre-packaged commercially available submersible duplex pump station.o The existing station has tested positive for lead coatings.o The new station, appurtenances, and connections will be constructed in the same location as the existing station.o An Ohio Permit-to-Install (PTI) permit is being secured by the Government for the new station and the contractor will have to comply with any requirements of the permit.b. A gravel driveway for station access and a security fence.c. Lining and repair rehabilitation work of portions of the existing sanitary sewer collection system. This affects approximately 10 manholes and 2,000 feet of 6 to 8-inch sewers.o Asbestos containing materials are presumed to be present in all or portions of the existing pipes.The work is to be performed entirely on Government property which consists of a public campground and two USACE field offices. The campground is open from mid-May to mid-September, while the two USACE field offices are open year-round.Project physical construction is proposed to take place in the campground off-season period between September 2023 and May 2024. This would allow the Contractor to perform construction with no interaction with the campground users.Disposal of construction waste material will be disposed of at commercially permitted facilities licensed to accept waste or recyclable materials as applicable.Construction work will occur in close proximity to flood mitigation and recreation areas. The existing facilities are currently operated and staffed by Government personnel 24 hours a day 365 days of the year.Seasonal recreation requires the water tank to be in operation Memorial Day (May 09, 2023) through Labor Day (September 05, 2023). All shutdowns are to be coordinated with the Contracting Officer or designated representative. W81ET431149822 Magnitude of Construction is Betw een $1,000,000.00 and $5,000,000.00

Details

Division 22 - Plumbing, Common Work Results for Plumbing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents