Similar Projects
Marion High School HVAC Upgrades
Alteration
Bidding
Marion, IA 52302

Fort Dodge Cooper Elementary HVAC Renovation
Renovation, Alteration
Bidding
Fort Dodge, IA

HVAC and Mechanical Products
Term Contract
Post-Bid

HVAC and Mechanical Products
Term Contract
Post-Bid

Bettendorf High School – Dust Collector Replacement
Alteration
Results
Bettendorf, IA 52722

Aquatic Center HVAC Replacement
Alteration
Results
North Liberty, IA 52317

Boone CSD High School HVAC Upgrades
Alteration
Bidding
$2,300,000 to $2,600,000 est. value
Boone, IA 50036

HVAC and Mechanical Products and Solutions
Term Contract
Post-Bid

Story County Justice Center HVAC Equipment Replacement Phase 2 and 3
Alteration
Results
Nevada, IA 50201

Chiller Replace - Roundy Elementary School
Alteration
Post-Bid
Columbus Junction, IA 52738

Building S-34 Vehicle and Welding Exhaust Upgrades
Alteration
Results
Johnston, IA

Camp Dodge S-52 HVAC and Lighting Upgrades
Alteration
Post-Bid
Johnston, IA

Data Room HVAC Installation at CSC
Alteration
Results
Cedar Rapids, IA

Ho-Chunk to Heritage Parking Ramp Skywalk Upgrades
Alteration
Post-Bid
Sioux City, IA

Mitsubishi HVAC Cassette Units
Alteration
Results
Cedar Rapids, IA

Reported 11/13/2021 12:00 AM
Project Title

Hawthorne Elementary HVAC Upgrades

Physical Address View project details and contacts
City, State (County) Keokuk, IA 52632   (Lee County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

Scope of Work include, but is not limited to the following: HVAC upgrades to Hawthorne Elementary School. The work will occur at 2940 decatur street, keokuk, iowa 52632. The project consists of a new HVAC System include a new chiller, boilers, VAVs, and unit ventilators. there will be an upgrade to the fire alaram devices for voice annuniciation, a domestic water backflow preventor, replace and upgrade two 1957 electrical panels, new celling grid and tile and misc. Demolition

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents