Similar Projects
Pueblo Water- 12" and 15" Storm Drain Pipe and Fittings
Infrastructure
Bidding
Pueblo, CO

On-Call Stormwater Construction
Infrastructure
Bidding
Colorado Springs, CO

On-Call General Construction Services
Term Contract
Post-Bid
Brighton, CO 80601

Stormwater Facility Maintenance
Post-Bid
Canon City, CO

2020 Cherrymoor South Interceptor Rehabilitation
Results
Cherry Hills Village, CO 80113

South Englewood Storm Sewer Maintenance
Results
Englewood, CO 80110

Plymouth Drive and Elk Court Storm Sewer Project
Infrastructure
Bidding
Aurora, CO 80019

2020 Sikis Subdivision Sewer Replacement Project Phase II
Post-Bid
Cortez, CO 81321

2020 Townwide Storm Pipe Camera and Vacuum Cleaning
Results
$30,000 to $50,000 est. value
Parker, CO

Arvada and Franktown Permanent Water Quality Structure Installation
Post-Bid
$54,000 est. value
Arvada, CO 80007

Tollgate and Sand Creek Interceptor Diversion Structures Rehabilitation Phase 2
Results
$3,210,000 to $3,370,500 est. value
Aurora, CO 80012

ACGC Weir Improvements
Post-Bid
Peyton, CO

Pipe Lining Projects
Results
Colorado Springs, CO 80903

Rabbit Ears Pass Storm Water Improvement
Post-Bid
Less than $430,000 est. value
CO

Grease Interceptors Maintenance Service
Term Contract
Results
Less than $184,760 est. value
Sterling, CO

Last Updated 06/29/2021 06:47 PM
Project Title

Bohn Park Stormwater Improvement Project

Physical Address View project details and contacts
City, State (County) Lyons, CO 80540   (Boulder County)
Category(s) Sewer and Water
Sub-Category(s) Storm/Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project proposes to install new and or replace existing inlets, manholes, and storm sewer. This contract’s scope of work includes installing nearly 51 linear feet of 19”x30” HERCP, 47 linear feet of 18” RCP, 145 linear feet of 36-inch RCP, 95 linear feet of 48-inch RCP, two new 60” manholes, and replacing approximately 21 feet of sidewalk and 32 feet of curb and gutter. For a detailed description of the full scope of work for this project see the Bohn Park Stormwater Improvement Project Plans and Bohn Park Stormwater Improvement Project Specifications. The contractor will determine the most suitable course of action to complete this project under the schedule proposed while coordinating with the Town and all stakeholders.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents