Similar Projects
Blue Heron Mine 18 Sanitary - New Onsite Wastewater Disposal System
Alteration
Design
Oneida, TN 37841

Wastewater Structure Rehabilitation Services
Term Contract
Bidding
Franklin, TN

Lookout Mountain Sanitary Sewer Rehabilitation Project - Phase 2
Alteration
Bidding
Chattanooga, TN 37403

Lupton Drive Chronic SSO Elimination
Renovation
Post-Bid
Chattanooga, TN 37400

Design/Build Services to Repair/Replace the Sanitary Sewer System at the Jacobs Civilian Conservation Center
Post-Bid
$500,000 to $1,000,000 est. value
Bristol, TN

East Ridge Sewer Basin 3C and 4B Rehabilitation
Results
Chattanooga, TN

Sanitary Sewer Cured In Place Pipe Lining (CIPP) Blanket Contract
Results
Less than $2,000,000 est. value
Chattanooga, TN 37402

Sprinkler System
Renovation
Construction
Clarksville, TN 37040

Old Walton Sewer Extension
Infrastructure
Bidding
Cookeville, TN

Upper Station Camp Creek Sewer Extension
Post-Bid
Gallatin, TN

Storm and Sanitary Sewer Revisions at Lupton City Mill
Results
Less than $598,589 est. value
Chattanooga, TN 37402

Fire Station 8 Sewer and Water Line Replacement
Infrastructure
Bidding
Clarksville, TN

Sewer Relocation for the West Beaver Creek Drive
Post-Bid
$400,000 est. value
Knoxville, TN 37918

Sewer Video and Sonar Inspection Services
Results
Less than $765,000 est. value
Chattanooga, TN 37405

Sewer System Rehabilitation
Infrastructure
Bidding
Oneida, TN

Reported 03/19/2022 12:00 AM
Project Title

Bandywood-Green Hills Rehabilitation

Physical Address View project details and contacts
City, State (County) Nashville, TN   (Davidson County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected May 2022, Construction Completion Expected September 2023
Bids Due View project details and contacts
Estimated Value
Plans Available from Design-Build Firm
Owner View project details and contacts
Architect View project details and contacts
Description

Renew aging infrastructure and to address downstream overflows by reducing the amount of rainfall that can enter the system through defects. It consists of the evaluation and rehabilitation (as necessary) of approximately 59,000 linear feet of gravity sewer, associated manholes, and service laterals within Metro's right-of-way and easements.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents