Similar Projects
RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

RFQ Contractor - Rainbow Cove Campground Improvements - Bear Lake State Park
Infrastructure
Post-Bid
$3,500,000 CJ est. value
Laketown, UT 84038

RFP Construction Manager - Marina Expansion
Infrastructure
Results
$45,000,000 CJ est. value
Garden City, UT 84028

Heritage Park Utility Pipelines
Infrastructure
Post-Bid

US-89; Logan Cyn, Brake Check & Intersection Impr.
Infrastructure
Post-Bid
$3,000,000 CJ est. value
Garden City, UT 84028

Bear Lake Special Service District Lift Station and Transmission Line
Infrastructure
Post-Bid
$2,200,000 CJ est. value
Garden City, UT 84028

North Eden Campground Improvement Project Phase 3 - Site Upgrades And Improvements
Infrastructure
Post-Bid
$2,000,000 CJ est. value
Laketown, UT 84038

Bear Lake Special Service District - Transmission Sewer Line Project
Infrastructure
Post-Bid
$400,000 CJ est. value
Garden City, UT 84028

Bear Lake Vistas
New Construction, Infrastructure
Post-Bid
$11,316,000 CJ est. value
Garden City, UT 84028

350 South Reconstruction
Infrastructure
Post-Bid
$2,900,000 CJ est. value
Garden City, UT 84028

Jefferson Area Utility Improvements
Infrastructure
Post-Bid
$2,340,000 CJ est. value
Garden City, UT 84028

Last Updated 05/24/2023 11:44 AM
Project Title

North Eden Campground - Phase 3 Site Improvements Bear Lake State Park

Physical Address View project details and contacts
City, State (County) Garden City, UT 84028   (Rich County)
Category(s) Entertainment/Recreation, Heavy and Highway, Sewer and Water
Sub-Category(s) Misc. Recreational, Park/Playground, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $3,330,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The project generally includes construction of the: campground service utilities including potable water source, storage, pressurization, and distribution system; electrical distribution and service system; wastewater collection and holding structures; entry guard station and area improvements; utility building and driveway; campsite and camp host shade shelters (pavilions), tables, and fire rings; campsite utility connection pads and marker bollards; campground dumpster pads; group RV / campsite loop roadway, firepit and grill; campsite gravel return lane; concrete and/or asphalt pavement surfacing; and, finish and fine grading of the campsite area. The prefabricated "Tioga" CXT restrooms will be delivered and installed by CXT. The Management Plan and Statement of Qualifications must be submitted to DFCM via email at dfcm_vbs@utah.gov no later than 12:00 NOON on Monday, October 17, 2022. Submittals received after the specified time will not be accepted. DO NOT SUBMIT VIA U3P. The Cost Proposals and Bid Bonds are to be submitted to DFCM via email at dfcm_vbs@utah.gov no later than 12:00 NOON on Thursday, November 3, 2022. DO NOT SUBMIT VIA U3P. A bid bond in the amount of five percent (5%) of the bid amount, made payable to the Division of Facilities Construction and Management on the AIA Document A310 - 2010 Bid Bond form, or equivalent, shall accompany the bid submitted to DFCM via email at dfcm_vbs@utah.gov. The Division of Facilities Construction and Management reserves the right to reject any or all proposals or to waive any formality or technicality in any proposal in the interest of the State.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Entrances, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Carpeting, Painting and Coating, Painting.
Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 12 - Furnishings.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Selective Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents