Similar Projects
Kayenta Judicial Facility
New Construction - 17,000 SF
Conception
Kayenta, AZ 86033

Court Building Renovations
Renovation
Conception
$3,000,000 est. value
Glendale, AZ 85301

City Hall Building Renovation
Renovation
Design
$1,620,000 est. value
Avondale, AZ 85323

Municipal Court Lobby Expansion
Renovation, Addition
Design
$1,556,000 est. value
Avondale, AZ 85323

Construction Manager at Risk Services, New Municipal Courthouse
New Construction
Bidding
$4,700,000 est. value
Lake Havasu City, AZ 86403

Studios at Mesa City Center
Renovation
Post-Bid
Less than $7,000,000 est. value
Mesa, AZ 85211

Project Manager Services for the Design and Construction of a Community Center and Aquatic Facility
New Construction
Post-Bid
Marana, AZ

City Hall Remodel Project
Renovation
Results
Less than $100,000 est. value
Sierra Vista, AZ 85635

Justice Center Southeast Consolidated Justice Courts & Adult Probation
Results
Mesa, AZ 85210

Prosecutor Office
New Construction
Conception
$1,320,000 est. value
Yuma, AZ 85364

City Hall Space Planning Tenant Improvements
Renovation
Design
$500,000 est. value
Buckeye, AZ

Guadalupe Town Hall Improvements
Results
Guadalupe, AZ 85283

Municipal Court Remodel
Renovation
Conception
$400,000 est. value
Bullhead City, AZ 86442

Kayenta Judicial Facility
New Construction
Design
Kayenta, AZ

Maricopa County Sherriff's Office 2 Substation
Renovation - 33,756 SF
Results
Avondale, AZ

Last Updated 10/07/2021 07:37 AM
Project Title

Construction Manager at Risk for Design Phase Assistance and Complete Construction Services for New City Hall

Physical Address View project details and contacts
City, State (County) Tolleson, AZ 85353   (Maricopa County)
Category(s) Government/Public
Sub-Category(s) Capitol/Court House/City Hall
Contracting Method Competitive Bids.
Project Status Design Development
Bids Due View project details and contacts
Estimated Value $10,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

A. Design phase services by the CM@Risk may include, but are not limited to the following: • Lead project planning and scheduling for both the design and construction phases; • Provide for construction phasing and scheduling; • Provide alternative systems evaluation and constructability studies; • Advise the City of ways to gain efficiencies in project delivery and reduce overall delivery time; • Provide long-lead procurement studies and initiate procurement of long-lead items; • Participate in regularly scheduled project coordination meetings; • Provide constructability reviews and comments at various levels of design; • Provide detailed cost estimating and knowledge of marketplace conditions at schematic, design development and construction document phases; • Concur with plans and specifications prior to construction; • Submit a Guaranteed Maximum Price (GMP) for City review and negotiation. B. Construction phase services by the CM@Risk may include, but not be limited to, the following: • Serve as the general contractor during construction; • Coordinate with various utilities; Arrange for procurement of materials and equipment; • Schedule and manage site operations; • Provide quality controls; • Bond and insure the construction; • Comply with all federal, state and local permitting requirements • Maintain a safe work site for all project participants.

Details

Division 03 - Concrete, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Entrances and Storefronts, Curtain Wall and Glazed Assemblies, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Partitions, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Flagpoles.
Division 12 - Furnishings, Window Treatments, Casework, Office Furniture, Multiple Seating.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems.
Division 22 - Plumbing, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Planting Irrigation, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents