Similar Projects
Replace 4th Floor Flooring
Term Contract
Design
$25,000 to $100,000 est. value
Grand Junction, CO 81501

Fitness Equipment and Flooring Installation
Alteration
Bidding
$200,000 est. value
Lafayette, CO 80026

South Boulder Recreation Center Floor Replacement
Alteration
Bidding
$30,000 est. value
Boulder, CO 80305

Replacement Gym Flooring
Post-Bid
Colorado Springs, CO

PHS Fluid Applied Acrylic Corridor Floors
Post-Bid
Fort Collins, CO 80521

UTE Mountain UTE Health Center Floor Removal and Installation Services
Results
Towaoc, CO 81334

Flooring Replacement
Results
Colorado Springs, CO 80912

Gym Floor Refinishing - BRMS and LHS
Post-Bid
Loveland, CO 80537

Flooring Supply and Installation Services
Results
Less than $490,000 est. value
Longmont, CO 80501

Carpet Maintenance
Post-Bid
Fort Collins, CO

Detention Center Flooring Replacement
Term Contract
Results
Glenwood Springs, CO 81601

Gym Floor Installations at Seven (7) Gyms
Post-Bid
$1,000,000 est. value
Colorado Springs, CO 80910

Health Department Painting and Flooring Replacement
Results
Greeley, CO 80631

Floor Covering Materials/Services for Douglas County Facilities
Term Contract
Post-Bid
Castle Rock, CO

Lesher Flooring Replacement Project
Results
Fort Collins, CO 80524

Reported 04/27/2022 12:00 AM
Project Title

BCEC Main Gym and Auxiliary Gym Floor Refinishing

Physical Address View project details and contacts
City, State (County) Sterling, CO 80751   (Logan County)
Category(s) Single Trades
Sub-Category(s) Flooring
Contracting Method Competitive Bids.
Project Status Request for Quotations, Construction Start Expected July 2022
Bids Due View project details and contacts
Estimated Value $50,000 [brand] Estimate
Plans Available from State Agency - 03/21/22
Owner View project details and contacts
Architect View project details and contacts
Description

1. Main Gym dimensions are 109 feet x 119 feet or 12,971 square feet 2. Auxiliary Gym dimensions are 114 feet x 119 feet or 13,566 square feet 3. Work to start tentatively on July 5th, 2022, (start date is flexible) and completion by July 29, 2022 4. Gym floor designs attached to bid posting on VSS. Bank of Colorado Logo will be as shown. The sizes of the lettering, the logos, and the “N” in the middle of gym floor to be determined. 5. Sand floors down using whatever grits necessary, finishing with a 120 grit sand paper, screening with 100 grit to make the appearance of a glass floor. 6. Polyurethane Wood Seal to be used is MARC 258 and Full Court Finish PC to be used is MARC 289 7. Application of two coats of sealer 8. Application of two coats of finish 9. Application of ALL court lines required by NCAA standards using Hillyard gym line paint 10. Main Gym – Men’s and Women’s Basketball and Women’s Volleyball lines painted per NCAA Standards 11. Main Gym – North and South under bleachers to include basketball lines painted as well 12. Auxiliary Gym – Men’s and Women’s Basketball and Women’s Volleyball lines painted per NCAA Standards 13. Auxiliary Gym – Tennis and Pickle Ball lines painted as well 14. Option to stain using water pop maple to allow wood to accept the stain evenly, dura seal stain of our choice 15. Option to st ain the perimeter of main gym floor with Northeastern stenci led “N” in center of floor and logos on side 16. Stencil work with stencil to be laid on floor and paint by number process used, pre-approved design 17. Polyurethane Wood Seal, dries to a clear transparent film that will not discolor the floor to be applied with lamb’s wool applicator

Details

Division 09 - Finishes, Flooring.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents