Similar Projects
Glenvale Topsham Meadow Solar
New Construction, Infrastructure
Conception
$20,000,000 CJ est. value
Topsham, ME 04086

Central Maine Medical Center Ambulatory / Outpatient Surgery Center
New Construction, Infrastructure - 20,000 SF
Conception
$14,000,000 CJ est. value
Topsham, ME 04086

$UPDATE PRESS - Mount Ararat High School - Arthur C. Dudley Construction
New Construction, Infrastructure
Design
$60,000,000 CJ est. value
Topsham, ME 04086

Frank J Wood Bridge - Maine Department Of Transportation
Demolition, New Construction, Infrastructure
Design
$17,000,000 CJ est. value
Topsham, ME 04086

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Richmond Maintenance Facility Buildings
New Construction, Infrastructure - 4,000 SF
Post-Bid
$500,000 est. value
Richmond, ME 04357

Construction of a Retaining Wall
Results
Richmond, ME

Statewide Geotechnical Drilling
Infrastructure
Results

Eagle River Subdivision Phase 2
New Construction, Infrastructure
Pending Verification
$1,500,000 CJ est. value
Topsham, ME 04086

The Uptown
New Construction, Infrastructure, Renovation
Pending Verification
$17,000,000 CJ est. value
Bath, ME 04530

Midcoast Youth Hockey
New Construction, Infrastructure - 28,000 SF
Design
$8,000,000 CJ est. value
Topsham, ME 04086

Market Basket / Topsham
New Construction, Infrastructure - 80,000 SF
Post-Bid
$21,000,000 CJ est. value
Topsham, ME 04086

Waterfront Parks and Pathways Guilford Lot and Bathport
Infrastructure
Results
Bath, ME

Central Maine Healthcare Corporation New Ambulatory Surgical Center
New Construction, Infrastructure - 20,000 SF
Pending Verification
$14,200,000 CJ est. value
Topsham, ME 04086

Maine School Administative District 75 High School Project
New Construction, Infrastructure - 150,000 SF
Post-Bid
$47,522,000 CJ est. value
Topsham, ME 04086

Last Updated 04/28/2023 11:34 AM
Project Title

2023 Stream Crossing Replacements

Physical Address View project details and contacts
City, State (County) Richmond, ME 04357   (Sagadahoc County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Shoreline/Erosion/Drainage, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $349,185 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The project involves the installation of two precast concrete box culverts and retaining walls (supplied by Town), gravel base and subbase, hot mix asphalt paving, steel beam guardrails and other related incidental items on Brown Road and Lincoln Street in Richmond. All bidders must furnish the following: 1. A completed Bid Form. 2. Experience Record (see Section 2-D) 3. A list of all subcontractors to be utilized on the project. 4. A bid security in the amount of 5% of the total bid in the form of a Bid Bond or certified check, made out to the Town of Richmond. The successful bidder must furnish the following: 1. Certificate of Insurance (in accordance with Section 3, Article 26) 2. 100% Construction Performance Bond 3. 100% Construction Payment Bond The Town of Richmond will have thirty (30) calendar days within which to accept or reject any bid. Inwater work for the installation of the concrete box culverts is allowed to start July 15, 2023 and must be completed by September 30, 2023. The work shall be completed by October 20, 2023 Liquidated damages in the amount of $250 per day are contained in the Contract. The Town of Richmond reserves the right to adjust the quantities contained in the Bid Form as needed in order to stay within the project budget. The Town of Richmond reserves the right to reject any and all bids, to waive any technical or legal deficiencies, and to accept any bid which is deemed to be in the best interest of the Town of Richmond, not necessarily the lowest bid. 1. Traffic Control . 2. Structure Removal/Common Excavation/Filling/Grading 3. Installation of Precast Concrete Box Culvert on Brown Road (supplied by Town) . 4. Installation of Retaining Walls on Brown Road (supplied by Town) 5. Installation of Precast Concrete Box Culvert on Lincoln Street (supplied by Town) . 6. Installation of Retaining Walls on Lincoln Street (supplied by Town) . 7. Riprap 8. Gravel Base (6" Type A) 9. Gravel Subbase (12" Type D) 10. 1-1/4" HMA Surface Pavement (9.5 mm) 11. 2" HMA Base Pavement (19.0 mm) 12. Shoulder Grave 13. Steel Beam Guardrails 14. Loam, Seed and Mulch 15. Erosion & Sedimentation Contro

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 34 - Transportation, Operation and Maintenance of Transportation.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents