Project Title | MACLAND Road 24-INCH Relocation and Corner/Florence Road Modification |
Physical Address | View project details and contacts |
City, State (County) | Marietta, GA 30066 (Cobb County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Water Lines |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Location 1:To remove and replace, at a lower elevation, a segment of existing 24” ductile iron pipe (DIP) that will be in conflict with a proposed 7-ft x 4-ft box culvert to be constructed as part of GDOT’s project. Location 2: Install new 48” steel casing, partially by open cut and by jack and bore, new 36” DIP and new 24” and 36” gate valves to simplify the Owner’s transmission system at the intersection of Macland Road and Corner/Florence Roads. The work includes abandonment of several existing pipes. Location 3: Install new 36” steel casing, by jack and bore, new 20” DIP and new 20” gate valves to increase the pipe size for the crossing under Florence Road from the existing 12” pipe to 20” pipe. Location 4: Add a 36” x 12” outlet to Cobb County Water System on the existing 36” DIP near Bullard Road. Adjustment of valve boxes, manholes and other appurtenances to grade due to changes caused by the proposed road widening project. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |