Project Title | Dewatering and Drying Belt Filter Press Overhauls at Jones Island WRF |
Physical Address | View project details and contacts |
City, State (County) | Milwaukee, WI 53207 (Milwaukee County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Sewage Treatment Plant, Site Development, Water Lines |
Contracting Method | Competitive Bids |
Project Status | Results, Construction start expected March 2023 |
Bids Due | View project details and contacts |
Estimated Value | $13,984,000 [brand] Estimate |
Plans Available from | Copy Center |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | MMSD FILE: 258S326r01.dgn The Contractor will overhaul 23 of the 24 belt filter presses (BFPs) in the Dewatering and Drying (D&D) building at the Jones Island Water Reclamation Facility (JIWRF) using parts from the original equipment manufacturer, Ashbrook Simon Hartley (Alfa Laval). For each of the 24 BFPs the Contractor will replace to following in kind: components of the Local Control Panel (LCP), polymer feed system, sludge feed and drain piping, BFP wash water system, and some structural steel. For all 24 BFPs the Contractor will remove surface corrosion and coatings from existing structural steel and piping and then apply new coatings to all structural steel and piping. The Contractor will also repair or replace the concrete hydraulic oil containment structures and damaged structural steel of several BFPs. For more information on the proposed work, please contact Millie Neidhardt at eneidhardt@mmsd.com MBE (13%), WBE (1%), DVBE (5%), SBE (5%) The Plans for the construction of the Dewatering and Drying Belt Filter Press Overhauls at Jones Island WRF, Contract J04075C01 consist of 43 sheets dated December 2022. The location of the work is shown on Sheet 3 of 43. The Contractor will overhaul 23 of the 24 belt filter presses (BFPs) in the Dewatering and Drying (D&D) building at the Jones Island Water Reclamation Facility (JIWRF) using parts from the original equipment manufacturer, Ashbrook Simon Hartley (Alfa Laval). For each of the 24 BFPs the Contractor will replace to following in kind: components of the Local Control Panel (LCP), polymer feed system, sludge feed and drain piping, BFP wash water system, and some structural steel. For all 24 BFPs the Contractor will remove surface corrosion and coatings from existing structural steel and piping and then apply new coatings to all structural steel and piping. The Contractor will also repair or replace the concrete hydraulic oil containment structures and damaged structural steel of several BFPs. |
||||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |