Similar Projects
Park Vista at El Tesoro Lift Station Facilities
New Construction
Bidding
Houston, TX 77083

Construction of Bridge Creek Lift Station No. 1
New Construction
Bidding
$1,094,000 est. value
TX

Golden Acres WWTP Influent Lift Station
Post-Bid
Pasadena, TX 77506

NHCRWA State Highway 249 Regional Pump Station Project 24C
New Construction
Post-Bid
$85,000,000 to $95,000,000 est. value
TX

Fountain View Regional LS Construction and Abandonment of Westheimer No. 1 LS
Results
$21,957,065 est. value
Houston, TX

Wastewater Treatment Plant Number 2 Lift Station to Serve
Results
Less than $2,326,844 est. value
Houston, TX 77002

Bayport Facility Vertical Line Shaft Pump Project
Renovation
Bidding
Pasadena, TX 77507

Booster Pump Replacement Project
Post-Bid
Bellaire, TX

Booster Pump Replacement
Results

Breen Road Lift Station
Renovation
Bidding
Houston, TX 77040

Inspection, Maintenance, Repair and Related Items of Lift Station
Term Contract
Post-Bid
Less than $220,000 est. value
Houston, TX

Sanitary Sewer Lift Station Stuebner Hollow
Results
Houston, TX 77070

Wastewater System Infrastructure Retrofit - Lift Station and Force Main Utilities
Infrastructure
Bidding
$5,800,000 to $6,000,000 est. value
Seabrook, TX

Reclaimed Water Pump Station
New Construction
Post-Bid
$1,070,000 est. value
TX

Repair Parts, Labor, and Related Items for Wastewater and Storm Water Lift Stations
Term Contract
Results
Houston, TX 77002

Last Updated 10/15/2021 05:01 PM
Project Title

Permanent Sanitary Sewer Lift Station

Physical Address View project details and contacts
City, State (County) TX   (Harris County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Project scope shall include construction of a triplex lift station including; 14-foot diameter wet well, three 1300 gpm submersible pumps, all piping, valves and fittings, electrical controls, and all associated electrical and site work. Conversion of existing lift station to a pass through manhole, construction of a 5-foot diameter manhole, associated sanitary sewer, construction of a concrete driveway and associated tie-in to Colonial Parkway.

Details

Lift and Pump Stations, New Construction.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents