Similar Projects
PADNOS Recycling Center / Wyoming
New Construction, Addition
Conception
$6,600,000 est. value
Grand Rapids, MI 49548

Shyft Group Manufacturing Expansion
Addition, Demolition, Renovation, Infrastructure
Conception
$16,000,000 CJ est. value
Charlotte, MI 48813

Buist Electric Expansion
Addition - 4,240 SF
Design
Byron Center, MI 49315

Mill Creek Brewery Development / Dexter
New Construction, Infrastructure
Design
$1,725,000 CJ est. value
Dexter, MI 48130

Hanover's Michigan Mints - New Location
Renovation - 3,300 SF
Post-Bid
Saint Johns, MI 48879

Duncan Aviation Expansion - SITE WORK PACKAGE ONLY
Infrastructure
Post-Bid
Battle Creek, MI 49017

Marijuana Processing Facility
Renovation - 2,000 SF
Construction
Ann Arbor, MI 48104

802 Central Complex
New Construction - 60,088 SF
Construction
$15,400,000 est. value
Muskegon, MI 49445

Cannabis Cultivation Facility
New Construction - 30,952 SF
Pending Verification
$5,000,000 est. value
Bay City, MI 48706

General Motors: Orion Township: Electric Vehicle Plant
Renovation
Pending Verification
Orion Township, MI 48359

King Milling Company Flour Mill Expansion
Addition, Demolition - 35,000 SF
Design
$42,000,000 est. value
Lowell, MI 49331

West Michigan Beef Company
New Construction - 75,790 SF
Construction
$5,000,000 to $10,000,000 CJ est. value
Hudsonville, MI 49426

General Motors: Delta Township: Battery Plant
New Construction - 2,500,000 SF
Pending Verification
$10,000,000 CJ est. value
Lansing, MI 48933

Navitas Manufacturing Building - Starlifter Lithium Battery Production Phase 2
New Construction
Design
$53,700,000 est. value
Ann Arbor, MI 48103

Speedrack Midwest - Phase 2
New Construction - 278,000 SF
Construction
$10,000,000 CJ est. value
Walker, MI 49544

Last Updated 04/28/2023 01:16 PM
Project Title

Bayer CropScience Facility / Muskegon

Physical Address View project details and contacts
City, State (County) Muskegon, MI 49445   (Muskegon County)
Category(s) Industrial/Manufacturing
Sub-Category(s) Manufacturing/Processing Plant
Contracting Method Bids by Invitation
Project Status Construction start expected January 2024
Bids Due View project details and contacts
Estimated Value $50,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project is a facility expansion and new equipment installation. As of April 28 2023, this project is seeking approval from the City of Muskegon, however certain initiatives have been approved by the city. Information regarding a general contractor has not been disclosed. A firm construction timeline has yet to be established. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Specialties, Lockers.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 13 - Special Construction.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Division 40 - Process Integration, Water Process Piping, Pneumatic Conveying Lines, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Batching Equipment, Conveyors, Cranes and Hoists, Specialty Material Handling Equipment, Manufacturing Equipment, Manufacturing Lines and Equipment, Container Processing and Packaging.
Division 44 - Pollution and Waste Control Equipment, Air Pollution Control, Odor Control, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents