Similar Projects
Last Updated | 06/03/2021 11:30 AM |
Project Title | Heating Plant Boiler #3 Replacement |
Physical Address | View project details and contacts |
City, State (County) | Greeley, CO 80639 (Weld County) |
Category(s) | Professional Services |
Sub-Category(s) | Engineering |
Contracting Method | Design-Build. Competitive Bids. |
Project Status | Accepting Qualifications |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | State Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | To replace Boiler #3 in the Heat Plant. UNC’s Heat Plant provides High Temperature Hot Water (HTHW) to buildings on campus for use in Heating, Cooling, and Domestic Hot Water systems. The HTHW system typically operates at 350F / 250PSI. The Heat Plant consists of 3 HTHW Boilers (Generators) of which Boiler #3 is the oldest. The Heat Plant is generally able to meet campus demand with a single boiler, but during high load situations, a 2nd boiler is required. The 3rd boiler serves as a back-up to the primary / secondary boilers. To lead the design process for the project. |
Details | |
Bidder's List | View project details and contacts |
Prospective Bidders | View project details and contacts |
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |