Similar Projects
Sawmill Parkway Materials Procurement
Infrastructure, Alteration
Post-Bid
Delaware, OH

DOW/PAWP - Parker Flow Control Valve
Results
Columbus, OH

Old Beechwold Stormwater System Improvements
Results
$6,948,336 est. value
Columbus, OH

JPWWTP - Water Regulator
Results
Columbus, OH

DRWP-2021 Culligan Water Softener System Service
Results
Less than $3,950 est. value
Columbus, OH

Olentangy River Road 24-Inch Water Main (Phase 2)
Results
Columbus, OH

Mainline Hydrants and Repair Pts UTC
Results
Columbus, OH

JPWWTP Raw Sewage Pump Valve Actuator Replacement
Results
Columbus, OH

DRWP-2021-BIF Rate of Control Venturi and Control Valve
Results
Columbus, OH

Magna Drive
Results
Columbus, OH

JPWWTP - AVK Gate Valve
Term Contract
Results
Less than $899 est. value
Columbus, OH

New World Drive Water Line Improvements
Infrastructure
Results
Columbus, OH

Water Leak and Water Outage Signs
Infrastructure
Results
Columbus, OH

Large Diameter Valve Replacement
Infrastructure
Results
Columbus, OH

Large Diameter Valve Replacement Pt 2 690589-100001
Infrastructure
Results
Columbus, OH

Last Updated 07/08/2022 02:49 PM
Project Title

Village of Waldo Water Main Improvements

Physical Address View project details and contacts
City, State (County) Delaware, OH   (Delaware County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

1. Furnish and install casing pipe to the limits described on the design drawings by the jacking and boring method to permit the installation of the carrier pipe. 2. Furnish and install carrier pipe. 3. Excavation of jacking and receiving pits, including all shoring, bracing, jacking shields, backstops and other incidentals as needed for the installation. 4. Injecting grout around casing pipe as required. 5. Temporary plugs, bulkheads, and structures. 6. Backfill and compaction of boring and receiving pits.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents