Similar Projects
Rathbun Creek Trail Phase 3 - C.5 - City of Big Bear Lake
Infrastructure
Conception
$1,591,600 est. value
Big Bear Lake, CA 92314

Hospital Channel - Yucca Valley
Infrastructure
Conception
$5,901,359 CJ est. value
Yucca Valley, CA 92284

State Street Village / Redlands Mall Development
New Construction, Infrastructure - 84,106 SF
Design
$275,000,000 CJ est. value
Redlands, CA 92373

Amazon Warehouse Development / Central Avenue
New Construction, Infrastructure - 201,096 SF
Design
$22,000,000 CJ est. value
Upland, CA 91786

Parker -bullhead City Hwy. (SR 95) (Needles Bridge #2435)
Infrastructure
Post-Bid
$800,000 CJ est. value
Bullhead City, AZ 86442

Asphalt Seal and Stripe - East Side
Infrastructure
Post-Bid
$300,000 CJ est. value
Victorville, CA 92395

EWWTP Well 3 Drilling
Infrastructure
Results
$587,085 CJ est. value
Elmira, CA 95625

EWWTP Well 3 Drilling
Infrastructure
Results
$587,085 CJ est. value
Elmira, CA 95625

O'Reilly Auto Parts (CL3) #6229 / Colton
New Construction, Infrastructure - 7,319 SF
Construction
$2,000,000 CJ est. value
Colton, CA 92324

VVC Stadium and Educational Event Center
New Construction, Renovation, Infrastructure
Construction
$32,338,000 CJ est. value
Victorville, CA 92395

Pumalo Street Townhomes
New Construction, Infrastructure
Pending Verification
$4,500,000 CJ est. value
San Bernardino, CA 92404

Silver Peak Solar Project
New Construction, Infrastructure
Pending Verification
$150,000,000 CJ est. value
Adelanto, CA 92301

Dupont Avenue Pavement Rehabilitation - City of Ontario
Infrastructure
Conception
$195,000 CJ est. value
Ontario, CA 91761

Starbucks and Burger King #4974 / Barstow
Demolition, New Construction, Infrastructure - 5,550 SF
Design
$1,700,000 CJ est. value
Barstow, CA 92311

RFP Engineering - Kessler Park Snack Bar Corridor Improvements
Infrastructure
Post-Bid
$3,300,000 CJ est. value
Bloomington, CA 92316

Last Updated 08/22/2023 05:06 AM
Project Title

Reservoir Seismic Upgrades Phase III for Devore, Del Rosa No. 3, Sycamore No. 1, and Terrace No. 3

Physical Address View project details and contacts
City, State (County) San Bernardino, CA 92401   (San Bernardino County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Storage/Water Tanks
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected October 2023
Bids Due View project details and contacts
Estimated Value $7,620,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Furnish all labor, material, and equipment required to retrofit four steel reservoirs to current seismic standards per the plans and specifications. Retrofits range from the addition of footings to increasing the roof height for added strength and seismic compliance. Question Deadline 08/11/2023 at 4:00 PM Questions regarding this Notice Inviting Bids may be directed to Sydney Morrison, Contracts Administrator, at (909) 384-5393 or email at Sydney.Morrison@sbmwd.org. The City has obtained from the Director of the Department of Industrial Relations the general prevailing rate of per diem wages in the locality in which this work is to be performed for each craft or type of worker needed to execute the Contract Contractor and its subcontractors performing work under this Contract will be required to pay California sales tax and other applicable taxes, and to pay for permits, licenses and fees required by the agencies with authority in the jurisdiction in which the Work will be located, unless otherwise expressly provided by the Contract Documents. City reserves the right to reject any or all bids or to waive any irregularities or informalities in any bids or in the bidding process.The City reserves the right to revise the Contract Documents prior to the Bid opening date. Revisions, if any, shall be made by written addenda Each Bid shall be accompanied by cash, a certified or cashiers check, or Bid Bond secured from a surety company satisfactory to the City, the amount of which shall not be less than ten percent (10%) of the submitted Total Bid Price

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents