Similar Projects
Waste Water Lift Station Pump and Grinder Replacement
Renovation
Bidding
Black Hawk, CO 80422

Rolling Hills Booster Pump Station
Renovation
Bidding
Colorado Springs, CO

Murphy Creek Lift Station Wetwell Recoating
Post-Bid
Aurora, CO

Milavec West Pump Station Screen and Filter Improvements
Post-Bid
Frederick, CO 80530

Notice of Request for Contractor Qualifications
Term Contract
Results
Thornton, CO 80229

WWTF Headworks and Lift Station Rehabilitation
Results
Less than $408,900 est. value
Lamar, CO 81052

Sewage Lift Station 11,000 - Glenwood Meadows
Renovation
Bidding
Glenwood Springs, CO

ERWSD & UERWA Water Storage Tank and Booster Pump Stations Hatch Improvements
Post-Bid
Vail, CO

Washington Street Stormwater Lift Station
Results
Less than $530,750 est. value
Lamar, CO 81052

63rd WTF Campus Electrical and High Service Pump Station Improvements
Alteration
Bidding
Boulder, CO

Zone 3/4 Pump Station MCC Replacement and VFD Install
Renovation
Post-Bid
Thornton, CO

Northern Water Supply Project North Booster Pump Station (NBPS) Overflow Channel Project
Results
Aurora, CO 80016

Recycled Water Pump and Treatment Station
Renovation
Bidding
$320,000 est. value
Bennett, CO

VCC Lift Station Design-Build Rehabilitation
Post-Bid
Aurora, CO 80016

29th Street Pump Station
Results
$2,000,000 to $3,000,000 est. value
Pueblo, CO

Reported 04/12/2022 12:00 AM
Project Title

Lawson Hill Pump Station

Physical Address View project details and contacts
City, State (County) Telluride, CO   (San Miguel County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The work shall furnish and install one factory built automatic pumping station. The station shall be complete with all equipment factory installed in a welded steel chamber or a pre-cast concrete chamber with a prefabricated roof scuttle and ladder for access. The internal equipment shall include two pumps and motors, piping and valves, ventilation system, heater, automatic central control panel with starters and breakers, and all internal wiring.

Details

Lift and Pump Stations, New Construction.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents