Similar Projects
Andrew Pickens Ranger District Roads Maintenance
Term Contract
Post-Bid
Less than $900,000 est. value
Mountain Rest, SC

Piedmont Forestry Center Paving Project
Infrastructure
Post-Bid
$400,000 CJ est. value
Tamassee, SC 29686

Drilling and Blasting for Oconee County Rock Quarry
Term Contract
Results
Walhalla, SC 29691

Seneca Creek Road Boat Ramp Site Development
Infrastructure
Results
Seneca, SC 29678

Piedmont / EHA Surgery Ambulatory Surgery Facility
New Construction, Infrastructure - 6,388 SF
Pending Verification
$4,967,543 CJ est. value
Seneca, SC 29672

Piedmont / EHA Surgery Ambulatory Surgery Facility
New Construction, Infrastructure - 6,388 SF
Pending Verification
$4,967,543 CJ est. value
Seneca, SC 29672

Indian Camp Branch Sediment Removal
Infrastructure
Post-Bid
$400,000 CJ est. value
Mountain Rest, SC 29664

Cherokee Lake Road Bridge Replacement
Renovation
Results
Walhalla, SC

Bountyland Pipe Replacement
Infrastructure
Post-Bid
$200,000 CJ est. value
Seneca, SC 29672

Safety Improvements - District 3
Infrastructure
Results

Walhalla Greenway
Infrastructure
Post-Bid
$500,000 CJ est. value
Walhalla, SC 29691

Rehabilitation - SC 107
Infrastructure
Results
SC

Coopers Mill S/D- Phase 1
Infrastructure
Post-Bid
$300,000 CJ est. value
Westminster, SC 29693

Reconstruction/Rehabilitation/Preservation
Infrastructure
Results
SC

Road Paving 2021-2022
Infrastructure
Results
SC

Last Updated 12/20/2022 02:04 AM
Project Title

S-258 (Chattooga Ridge Rd. ) over Village Creek Bridge Replacement

Physical Address View project details and contacts
City, State (County) West Union, SC 29696   (Oconee County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected June 2024
Bids Due View project details and contacts
Estimated Value $5,250,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Project Type Bridge Replacement As of December 20, 2022, the project is in Conceptual status. Anticipated letting month/year is October, 2023. SCDOT - S-258 (Chattooga Ridge Rd. ) over Village Creek Bridge Replacement *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents