Last Updated 02/03/2020 04:07 PM
Project Title

Rehabilitation Improvement for the Levee at Edinburg Pump Station

Physical Address View project details and contacts
City, State (County) TX   (Hidalgo County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,000,000 to $5,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work for this project generally consists of construction of levee improvements, including earthen embankment and concrete floodwalls, and associated ramps. The major construction efforts include, but are not limited to, preparing right-of-way, removing/stockpiling existing excavated material, levee widening, erosion control, demolition, installing two new sections of floodwall with bollard walls, drilled pier floodwall foundations, installing cement-bentonite slurry cutoff wall, steel sheet piling, installation of drainage blanket/chimney drain, completing construction of an existing gatewell structure, backfilling and grading of levee embankment material, installing aggregate roadway surface, riprap, removal and replacement of chain link fencing, and revegetation. Drilled piers shall be installed 30 inch in diameter and 60'-9" in length. Full depth temporary casing shall be used for all drilled piers. The contractor/subcontractor performing the drilled pier work shall have successful completion of at least three (3) separate foundation projects within the last five (5) years with drilled piers of similar size (diameter and depth) and installation difficulty to those shown in the Contract Drawings, and with similar subsurface geotechnical conditions (e.g., groundwater levels, soil classification and consistency, etc.). Cement-bentonite slurry cutoff wall shall be installed 3 feet wide, 30 feet deep, for a length of 170 feet. The contractor/subcontractor performing the slurry wall shall have successfully installed a minimum area of million (1,000,000) square feet of cement-bentonite slurry cutoff wall, including at least two projects within the last five (5) years with similar depths, lengths, and subsurface conditions.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents