Similar Projects
Furnish Adjustable Speed Drives as Specified
Term Contract
Results
Syracuse, NY 13202

Furnish and Install Piping Insulation
Term Contract
Post-Bid
Syracuse, NY 13202

J041--Cooling Tower Fill Service for Syracuse VA
Term Contract
Post-Bid
Syracuse, NY 13210

Furnish Boiler Replacement at Three Buildings
Alteration
Post-Bid
Syracuse, NY 13210

Rehabilitate Hot Water Heating System Walters Hall
Results
Syracuse, NY 13210

Furnish Boiler Tube Replacement as Specified
Post-Bid
Syracuse, NY

Medical Gas Outlet Testing
Term Contract, Alteration
Bidding
Syracuse, NY 13210

Furnish SSH Series Water Heater
Results
Syracuse, NY 13202

J041--Cooling Tower Fill Service for Syracuse VA 528A7 VHA Directive 1193
Term Contract
Post-Bid
Syracuse, NY 13210

Furnish Water Heaters as Specified
Term Contract
Results
Jamesville, NY

Medical Library Steam Service Modifications
Results
Syracuse, NY

Z--528A7-20-782 Extend Heating Hot Water to Kitchen and Misc Repairs
Results
$250,000 to $500,000 est. value
Syracuse, NY

Preventive Maintenance of Building Management System (BMS) and Ancillary Equipment
Term Contract
Post-Bid
Syracuse, NY 13210

J045--Hot Water Boiler Maintenance, Testing, Repair, and Inspection
Post-Bid
Bath, Syracuse, NY 13210

Beaver Lake Boiler Replacement and Conversion
Alteration
Results
Baldwinsville, NY 13027

Last Updated 10/14/2021 10:00 AM
Project Title

Furnish Brewerton WWTP Chlorine Contact Valve Replacement

Physical Address View project details and contacts
City, State (County) Brewerton, NY 13029   (Onondaga County)
Category(s) Single Trades
Sub-Category(s) Mechanical
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The scope of work for this project will include the replacement of two (2) six inch gate valves located on the six inch ductile iron drain lines from the Chlorine Contact Tank including excavation, shoring, valve replacement, backfilling, compaction and restoration of surfaces. Work involves the removal of two leaking 6-inch gate valves and installation of two 6-inch resilient wedge gate valves on six inch ductile iron (6” D.I.) drain lines leading downstream of an active chlorine contact tank. One valve is located approximately three feet north of the tank and the other is three feet south of the tank directly in the center of the tank in the east and west direction. Both valves are easily located by the above grade valve boxes. Installation shall include excavation down to the valves plus six inches (6”) for bedding. Based on the tank measurements the valve is assumed to be at a depth of 12’6” +/- six inches. Excavations shall be shored in accordance with OSHA regulations as necessary to obtain proper depth. Dewatering including pumps, hoses, fuel shall be included. Coordinate sump pump discharge location with County Inspector.

Details

Division 46 - Water and Wastewater Equipment, Operation and Maintenance of Water and Wastewater Equipment, Common Work Results for Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents