Similar Projects
Victoria Force Main Improvements Project
Renovation, Infrastructure
Bidding
$300,000 est. value
Newburgh, IN

Liberty Water System Improvements
Infrastructure
Bidding
$400,000 est. value
Liberty, IN

Water Utility Improvements Division D- Service Lines- Phase 3
Post-Bid
Crown Point, IN

Water Main Relocation
Post-Bid
Petersburg, IN

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

Division I - 2022 Water Distribution System Improvements
Infrastructure
Bidding
$700,000 est. value
Greencastle, IN

Pool and Spray Park Water Maintenance
Term Contract
Post-Bid
Indianapolis, IN

Distribution System Improvements
Results
Fountain City, IN 47341

BL000A Domestic Water Main Replacement (Woodlawn Field)
Infrastructure
Bidding
$300,000 est. value
Bloomington, IN 47406

Chrisney Water Improvements
Post-Bid
Chrisney, IN

Hessen Cassel Storm and Sidewalk Improvements
Results
Fort Wayne, IN 46800

Water and Sewer Replacement (152nd Street to Columbus Drive)
Infrastructure
Bidding
$200,000 est. value
East Chicago, IN

Calumet Avenue Water Distribution System Improvements - Contract -3
Post-Bid
Dyer, IN 46311

Wabash River Water Main Crossings
Results
Peru, IN

Reported 05/27/2022 12:00 AM
Project Title

Cromwell Waterworks Improvements Project A

Physical Address View project details and contacts
City, State (County) Cromwell, IN   (Noble County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $500,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Site work for a civil project in Cromwell, Indiana. Completed plans call for site work for a water / sewer project.This work involves the addition and renovation to the existing water treatment plant facility, improvements to the supply wells at the water treatment facility, and replacement of fire hydrants within the distribution system in Cromwell, Indiana. Contractors and Sub-Contractors are required to pay not less than the Federal Wage Scale published by the U.S. Department of Labor. Project will be funded by a loan through Indiana Finance Authority and administered by the Indiana State Revolving Fund (SRF). Bidders and selected contractor must meet requirements for a SRF funded project. The work to be performed and the bids submitted, including any and all separate and combination bids, shall include sufficient and proper sums for all General, Construction, Mechanical, Electrical, Installation, Labor, Materials, Tools, Equipment, Taxes (both Federal and State), Permits, Licenses, Insurance, Service Costs, and so forth, incident to and required for the construction of the facilities. Each bid shall be accompanied by a Certified Check or acceptable Bidder's Bond made payable to the Owner, in a sum of not less than five percent (5%) of the total amount of the highest aggregate proposal, which check or bond will be held by the Owner as evidence that the Bidder will, if awarded a contract or contracts, enter into the same with the Owner upon notification from him to do so within fourteen (14) days of said notification. Approved Performance and Payment Bonds guaranteeing faithful and proper performance of the work and materials, to be executed by an acceptable surety company, will be required of each Contractor at the time of contract execution. The bond will be in the amount of one hundred percent (100%) of the contract price and must be in full force and effect for a period of twelve (12) months from the date of written acceptance of and final payment of the work. Failure to execute a contract and to furnish a Performance and Payment Bond as hereinafter set out will be cause for forfeiture to the Owner of the amount of money represented by the Certified Check or Bidder's Bond, as and for liquidated damages. No bids shall be withdrawn after the opening of bids without the consent of the Owner for a period of sixty (90) days after the scheduled time of receiving same. The Owner reserves the right to reject any bid, or all bids, or to accept any bid or bids, or to make combination of bids as may seem desirable, and to waive any and all informalities in the bidding.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents