Similar Projects
8(A) Regional Refuse Collection, Disposal and Recycling Services
Post-Bid
Washington, DC

Soil Removal and Replacement Services
Post-Bid
Washington, DC 20001

S--Dump Transfer Station Site
Results
Washington, DC

S--NACE FY20 Tree Removal-Cyclic
Results
Washington, DC 20020

Hauling/Pick-Up/Removal Rigging Services
Post-Bid
Washington, DC 20001

NACE Waste Transfer Station
Term Contract
Results
Washington, DC

Personal Electronic Device & Metal Wreckage Disposal
Post-Bid
Washington, DC 20594

District of Columbia Army National Guard Recycling Services
Term Contract
Results
Washington, DC - Fort Belvoir, VA 20003

Solids Screening Facility Hauling and Adjustment Services of Roll Off Containers
Term Contract
Post-Bid
Washington, DC 20032

Snow Removal from Driveways, Roadways and Parking Lots
Post-Bid
Washington, DC 20018

Residuals Hauling
Term Contract
Post-Bid
Washington, DC 20032

Waste management services
Term Contract
Post-Bid
Washington, DC

Snow Removal
Infrastructure
Post-Bid
Washington, DC

CCMNT21023 - CTEM Flatcar Deck Lumber
Infrastructure
Post-Bid
Washington, DC

Snow and Ice Removal Services
Term Contract
Post-Bid
Washington, DC 22202

Last Updated 01/13/2022 04:22 PM
Project Title

NCR Regional Waste Removal Service

Physical Address View project details and contacts
City, State (County) Washington, DC 20002   (District of Columbia County)
Category(s) Heavy and Highway
Sub-Category(s) Hauling
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Original Set Aside: 8(a) Set-Aside The Service work includes a company that can process Recyclable Recovery Services; “All In One” Municipal Solid Waste-MSW, also known as Mixed Waste Processing-MWP or using a “Dirty Materials Recovery Facility-MRF.” MWP is a one-container system where we (the Federal Government) place all trash and recyclables in one container with no separation. This container would be transported to you (the Source) for sorting to glean recyclables. Your facility would then use a combination of machinery and/or human hands to sort.

Details

Division 41 - Material Processing and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents