Similar Projects
FY20 Neches Salt Water Basin Stop Logs
Design
$1,000,000 to $5,000,000 est. value
Beaumont, TX 77703

Mcfaddin National Wildlife Refuge Beach Restoration Phase 2
Bidding
$55,400,000 to $66,800,000 est. value
Sabine Pass, TX 77655

Dune Planting for the Mcfaddin National Wildlife Refuge Beach and Dune Restoration Project
Bidding

Repair Seven (7) Drainage Pump Stations
Post-Bid
Port Arthur, TX

USACE Galveston District, Sabine Neches Waterway PA11 Containment Dike Raise in Jefferson County, Texas
Post-Bid
$1,000,000 to $5,000,000 est. value
Beaumont, TX

Atlantic Canal Crossing Improvements 2nd Street thru 12th Street
Results
$5,180,000 est. value
TX

Port Arthur Hurricane Flood Protection Project (HFPP) Harvey Repairs in Jefferson County, Texas.
Results
$1,000,000 to $5,000,000 est. value
TX

Placement Area 18 Levee Project
Post-Bid
Port Arthur, TX 77642

Center Street Ditch Cleaning Project
Results
$37,500 est. value
TX

On-Call Plumbing/Sewer and Drain Services
Term Contract
Post-Bid
Port Arthur, TX 77640

Z--IDIQ for Stream Gage Site Rprs, Oklahoma and Texas
Results

Placement Area 9 Levee Project
Post-Bid
Port Arthur, TX 77642

Sabine Pass Area Drainage System Select Ditch Cleanout
Results
Sabine Pass, TX 77655

Placement Area 26 Levee Construction Project
Post-Bid
Port Arthur, TX 77642

Beaumont Municipal Airport Ditch Cleaning and Repair Project
Results
Less than $97,000 est. value
Beaumont, TX

Last Updated 04/22/2021 10:40 AM
Project Title

Tyrrell Park Loop Drainage

Physical Address View project details and contacts
City, State (County) Beaumont, TX   (Jefferson County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project shall provide for the Construction of new drainage ditches, the cleaning and restoration of existing drainage ditches outlined in the plans at the Tyrrell Park Loop, concrete repair to existing sidewalk, gravel driveway and removal and replacement of storm sewer culverts including all backfill and compaction required. All ditches to be constructed and reshaped will follow the typical cross section design from the plan set. The contractor shall construct and or reshape approximately 5,489 linear feet of drainage ditch as shown on the plans, and as directed by the City of Beaumont. This contract shall include all necessary labor, equipment, tools, materials, safety measures, environmental protection, disposal of surplus items, site restoration, and all other related construction.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents