Similar Projects
Waltman to Shoshoni US 20/26 - N342054 - Fremont County
Infrastructure
Conception
$4,270,000 CJ est. value
Shoshoni, WY 82649

Waltman to Shoshoni US 20/26 - N342054 - Fremont County
Infrastructure
Conception
$4,270,000 CJ est. value
Shoshoni, WY 82649

Lander High Pressure Water System Upgrades - Phase III Projects
New Construction, Infrastructure
Bidding
$200,000 CJ est. value
Lander, WY 82520

Central Wyoming Regional Airport Riverton
Infrastructure
Bidding
$2,000,000 CJ est. value
Riverton, WY 82501

WY NPD Yell 14(1) Lewis River Bridge
Term Contract
Post-Bid
Yellowstone National Park, WY

Project Manual for Fremont County Solid Waste Disposal District Scalehouse Construction
New Construction, Infrastructure
Post-Bid
$320,000 CJ est. value
Lander, WY 82520

Grading, Milling Plant Mix, Bituminous Pavement Surfacing, Bridge Rehabilitation, Temporary Concrete Barrier, Guardrail And Miscellaneous Work
New Construction, Infrastructure
Results

Bituminous Pavement Surfacing(Recycle)
Infrastructure
Results
WY

Lander to Sinks Canyon Wyoming 131 - 0701005 - Fremont County
Infrastructure
Conception
$3,291,000 CJ est. value
Lander, WY 82520

2023 Wastewater Treatment Plant Improvements
Infrastructure
Bidding
$900,000 CJ est. value
Dubois, WY 82513

RIW 053-054 Taxiway A, C1, and D Rehabilitation Rebid
Infrastructure
Post-Bid
$4,000,000 CJ est. value
Riverton, WY 82501

Waltman - Shoshoni
Infrastructure
Results
$200,000 est. value
Belle Fourche, SD 57717

Ethete to Kinnear WY 132
Infrastructure
Conception
$3,000,000 CJ est. value
Ethete, WY 82510

Drilling, Construction, Development, and Test Pumping For Pavillion Well No. 9
Infrastructure
Bidding
$220,000 CJ est. value
Pavillion, WY 82523

Riverton Taco John's Remodel
Addition, Renovation, Infrastructure
Post-Bid
$250,000 CJ est. value
Riverton, WY 82501

Last Updated 04/14/2023 05:42 PM
Project Title

Loops 1 and 2 Gravel Road Rehabilitation project

Physical Address View project details and contacts
City, State (County) Ethete, WY 82510   (Fremont County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $166,109 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Wyoming Department of State Parks and Cultural Resources, Division of State Parks, Loops 1 & 2 Gravel Road Rehabilitation project at Boysen State Park, Fremont County, Wyoming. This project will consist of watering, regrading, reshaping, applying magnesium chloride and compacting portions of the existing Loop 1 and Loop 2 gravel roads, replacing one cattleguard, and replacing one 48-inch diameter CMP culvert (62 feet long), placing new gravel surfacing as directed on the roads at select locations, traffic control, and reclamation. Written questions about the procurement process should be submitted by through the Public Purchase online bidding system until 11:00 am MST, March 8, 2023. Any questions received after the deadline may not be accepted or considered. Each question should be submitted individually. Last Day for questions – March 9, 2023 by 11:00 am

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents