(315-Ft) Bridge Preservation Project Including Bridge Deck Patching and Overlay Expansion Joint Replacement, Bearings, Piers, and Beams Repair. Location: Bridge Carrying Black Road Over I-55
New Construction, Infrastructure
Bidding
Joliet, Shorewood, IL
(293-Ft) Bridge Deck Overlay and Bridge Joint Repair of the US 14/Peterson Ave Bridge Over I-94
New Construction, Infrastructure
Bidding
Chicago, IL
Lincoln Yards - Dominick Bridge
New Construction
Post-Bid
$35,000,000 est. value
Chicago, IL 60601
2021 Bridge Repair Program
Post-Bid
Oswego, IL
Bridge Joint Repairs, Bridge Repairs, New 4.5- Concrete Bridge Deck, HMA Mill and Fill
Results
IL
Replace the Bridge Carrying CH 29D Over Jubilee Creek
Results
Brimfield, IL 61517
Elim Bridge Replacement
New Construction, Demolition
Construction
Crestwood, IL
(200-Ft) Partial and Full Depth Deck Repairs to the Structure that Carries Wayman St Over 1-90/94. also Included are Longitudinal Joint Closure, Application of Protective Coat, Cleaning and Sealing of Transverse Joints, and Installation of Temporary Protective Shield
New Construction, Infrastructure
Bidding
Chicago, IL
Skyway 75th Avenue Bearing Pedestal
Renovation
Post-Bid
Chicago, IL 60707
Replace the Bridge Carrying Drawbridge Road Over Jacksonville Branch, 0.1 Mile South of Wabash Avenue in Springfield
Results
Springfield, IL 62708
Bridge Deck Repairs Southbound FAI 55 (I-55) SN 057-0154 over US 136
New Construction, Infrastructure
Bidding
IL
TR 243 Bridge Replacement & Approach Roadway
Renovation
Post-Bid
Nashville, IL
Bridge Replacement on Kinlou Road
Results
IL
Bridge Overlay of SN 059-0500 Carrying IL 111 over the Otter Creek Overflow, Approximately 2.2 Miles North of IL 108
New Construction, Infrastructure
Bidding
IL
Construction Single Span Bridge
Renovation
Post-Bid
Marion, IL