Similar Projects
Maryville School Lift Station Replacement
New Construction, Infrastructure
Bidding
Georgetown, SC 29440

Wastewater Inflow and Infiltration (I and I) Rehabilitation Project Within the Shirley Drive Pump Station and Old Lagoon Pump Station Service Areas
Renovation, Infrastructure
Bidding
$420,000 est. value
Williamston, SC

Central Plant Pump Station Motor Replacement
Post-Bid
Conway, SC 29526

Pump Station 7 Repairs
Post-Bid
$100,000 to $300,000 est. value
Hollywood, SC 29449

South Greenville Enterprise Park Pump Station
Results
Greenville, SC 29673

Construction of the Pump Station Upgrades
Results
Johnsonville, SC 29555

Wwtf Modifications
Renovation
Bidding
Lyman, SC

Lake Rabon Raw Water Pump Station Surge Tank Improvements
Post-Bid
$600,000 to $700,000 est. value
Laurens, SC

Brodie Pond Pump Station Improvements
Results
Batesburg-Leesville, SC

Pre-Engineered Duplex Pump Station
New Construction, Infrastructure
Bidding
Pageland, SC 29728

Plant Control Pump Station - Pump Base Improvements
New Construction
Post-Bid
Charleston, SC

Pump Station #153 Control Panel Replacement
Results
Andrews, SC 29510

Buchanan Bridge Pump Station and Force Main
Renovation
Post-Bid
Less than $400,000 est. value
Chesterfield, SC

Edgefield Drive Pump Station Upgrade and Force Main Extension
Results
Bishopville, SC 29010

O Dell Street Lift Station and Sewer Line
Infrastructure
Post-Bid
Liberty, SC 29657

Reported 11/15/2021 08:18 AM
Project Title

6 Pump Station Repairs

Physical Address View project details and contacts
City, State (County) Hollywood, SC   (Charleston County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status No Responses Submitted
Bids Due View project details and contacts
Estimated Value $40,000 to $120,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Scope: Install concrete for base for new Electrical Panel (already available and purchased) core wet well to provide access for electrical lines to pumps (pumps already purchased), Reconnect underground power to new panel location and all associated alarms, cables, station alarms and controls. provide for bypass pumping until the construction is completed and inspections approved.

Details

Lift and Pump Stations, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents