Similar Projects
Windmill Pump Station Replacement
New Construction
Bidding
Easton, MD

Tri-State and UHL Highway/Oldtown Road Pump Station Rehabilitation Project
Renovation
Bidding
Oldtown, MD 21555

Underground Storage Tank Conversion
New Construction, Demolition
Post-Bid
Ashton, Brentwood, Silver Spring, MD 20707

Underground Storage Tank Conversion
New Construction, Demolition
Post-Bid
Ashton, Brentwood, Silver Spring, MD 20707

Primary Settling Tanks Nos. 3 & 4 Rehabilitation at the Back River WasteWater Treatment Plant
Results
$15,000,000 to $20,000,000 est. value
Baltimore, MD 21224

Primary Settling Tanks Nos. 3 & 4 Rehabilitation at the Back River WasteWater Treatment Plant
Results
$15,000,000 to $20,000,000 est. value
Baltimore, MD 21224

Renovation and Improvements to Stormwater Pumping Station No.3
Renovation
Bidding
Frederick, MD 21701

Operational Superintendent for the Water and Wastewater Treatment Plants
Renovation, Term Contract
Post-Bid
Beltsville, MD 20705

Design Build Services for Improvements to Sewer Pump Station 8
Results
$275,000 to $325,000 est. value
Bowie, MD

Ballenger Mckinney Influent Pumping Station Modifications
New Construction
Bidding
Frederick, MD 21704

McKeil Point Bermed Infiltration Pond On-Site Sewage System Removal
Infrastructure
Post-Bid
Cambridge, MD

North Pump Station and Sanitary Main Improvements
Results
Hampstead, MD 21074

Marley Avenue SPS Upgrade
Results
$1,000,000 to $1,500,000 est. value
Annapolis, MD 21401

Locust Grove Sewage Pumping Station Replacement
Results
$8,000,000 to $12,000,000 est. value
La Vale, Locust Grove, MD 21502

Central Correctional Facility Collection System Upgrade
Results
Sykesville, MD 21784

Last Updated 03/01/2022 09:42 AM
Project Title

Replacement of National Guard Pump Station and Force Main

Physical Address View project details and contacts
City, State (County) Havre de Grace, MD   (Harford County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Replacement of the pump station and force main located on the National Guard Reservation. - Disconnection and abandonment in place existing four (4) inch CIP Force Main. - Construction of 672 linear feet of eight (8) inch ductile iron pipe force main - Demolition and removal of existing pump station - Construction of new pump station

Details

Division 02 - Existing Conditions.
Division 03 - Concrete, Precast Concrete.
Division 05 - Metals, Metal Fabrications.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes, Painting.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents