Similar Projects
N Townsend Avenue Retail Development
New Construction, Infrastructure
Design
$2,479,611 CJ est. value
Montrose, CO 81401

Montrose Regional Airport Coffee Concession
Infrastructure
Bidding
$50,000 CJ est. value
Montrose, CO 81401

RFP D/B - Amphitheater Storage Facility
New Construction, Infrastructure
Bidding
$1,500,000 CJ est. value
Montrose, CO 81401

Black Canyon Boys and Girls Club / Montrose
New Construction, Infrastructure - 18,500 SF
Post-Bid
$4,700,000 CJ est. value
Montrose, CO 81401

Black Canyon Boys and Girls Club / Montrose
New Construction, Infrastructure - 18,500 SF
Post-Bid
$4,700,000 CJ est. value
Montrose, CO 81401

Montrose Regional Health Ambulatory Care Center
New Construction, Infrastructure - 80,000 SF
Pending Verification
$43,000,000 CJ est. value
Montrose, CO 81401

Nucla Affordable Housing Development
New Construction, Infrastructure
Pending Verification
$5,600,000 CJ est. value
Nucla, CO 81424

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Ridgway Water Treatment Plant - Project 7 Water Authority
Infrastructure
Pending Verification
$50,000,000 CJ est. value
Montrose, CO 81401

6700 Road Extension Project
Infrastructure
Post-Bid
$291,300 CJ est. value
Montrose, CO 81401

Trails at Cobble Creek
New Construction, Infrastructure
Pending Verification
$80,000,000 CJ est. value
Montrose, CO 81403

2022 Water System Improvements
Infrastructure
Post-Bid
$250,000 est. value
Naturita, CO

Fiori Di Lena
New Construction, Infrastructure
Pending Verification
$4,700,000 CJ est. value
Montrose, CO 81401

South 3rd Plaza Construction
Infrastructure
Post-Bid
$1,973,608 CJ est. value
Montrose, CO 81401

RFP D/B - Project 7 Water Authority - Water Supply Resiliency Program - Water Treatment Plant (Package 1) and Waterline (Package 2)
Infrastructure
Post-Bid
$94,000,000 CJ est. value
Montrose, CO 81401

Last Updated 05/22/2023 03:36 PM
Project Title

Block 93 Sewer Replacement

Physical Address View project details and contacts
City, State (County) Montrose, CO 81401   (Montrose County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $468,105 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The City reserves the right to accept or reject any or all bids, to waive irregularities and/or informalities and to disregard all non-conforming, non-responsive, unbalanced or conditional bids. The City of Montrose complies with all Equal Opportunity requirements. All qualified bidders will receive consideration without regard to race, creed, color, national origin, sex, marital status, religion, ancestry, mental or physical handicap or age. The project is also bid according to the City of Montrose local preference policy in effect on the date of the bid opening and detailed in the official Municipal Code of the City of Montrose, Section 1-16-4(B). The deadline for receipt of questions from Bidders in regards to this RFP is 12:00 Noon on April 10, 2023. Responses will be prepared by the City in an addendum and published on the City of Montrose web site at: www.cityofmontrose.org under Department Services, Purchasing, Open bids, under this bid name. The responses in writing are the only official answers. The project consists of furnishing all labor, equipment, and materials necessary to complete construction of the Block 93 Sewer Replacement Project in accordance with the project plans and specifications. This includes, but is not limited to, the following key tasks: A. Perform asphalt or concrete flatwork removals to gain access for sewerline construction. B. Pothole existing service and tie-in locations to verify horizontal and vertical locations. C. Perform a directional drill replacement of the east-west sewer mainline. This will utilize the existing sewerline for the pilot hole of the directional drill and pull back Certa-Flo sewer piping while reaming out the old clay pipe. D. Reconnect services to the directionally drilled mainline replacement. E. Install a sanitary sewer mainline replacement (north-south leg) utilizing conventional open-cuttrenching. F. Extend and reconnect services to the open-cut mainline. G. Install and insert manholes on new sanitary sewer mainlines. H. Bypass or otherwise accommodate existing sewer flows throughout construction as necessary to install new improvements. I. Backfill excavations and restore pavement. J. Coordinate the relocation and perform earthwork support for any conflicting dry utilities. At this stage, the only known dry utility relocation is a natural gas line at the eastern end of the project. Any costs from the utility company will be paid for directly by the City. K. Implement stormwater management (no stormwater construction permit with CDPHE required), traffic control (incl. traffic control plan), site security, site restoration, final grading, and qualitycontrol testing as necessary to complete the work in accordance with the project plans and specifications.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents