Similar Projects
Balboa Park Sewer Rehabilitation
Post-Bid
Denver, CO

Construction of the East 69th Avenue Forcemain
Post-Bid
Denver, CO 80229

Force Main and Siphon Condition Assessment and Cleaning
Results
Denver, CO 80229

Interceptor Rehabilitation 2020 - 2022
Results
CO

2021 Preventive and Critical Lining
Post-Bid
$3,500,000 to $3,900,000 est. value
Denver, CO 80202

Sewage Ejectors Ellie Caulkins
Results
Denver, CO 80204

Non-Destructive Excavating, Potholing, Hydro-Jetting and Vacuuming
Post-Bid
Denver, CO 80204

High Point Possum Gully Sanitary Sewer
Results
Denver, CO

FNS Sanitation System
Term Contract
Post-Bid
CO

East 16th Avenue System, Phase 1
Results
$8,500,000 to $9,400,000 est. value
Denver, CO 80202

East 64th Avenue and Denali Street Infrastructure Project
Post-Bid
Denver, CO 80202

R3 S6 Sand Trap Cleaning
Results
Denver, CO 80204

Transmission System Structure Rehabilitation
Post-Bid
Denver, CO 80229

Tunnel Sewer Repairs
Results
Denver, CO

Public Improvements within Phase 2 of The Point Redevelopment Project
Post-Bid

Last Updated 07/08/2021 06:20 PM
Project Title

General Sanitary - Lincoln Park North

Physical Address View project details and contacts
City, State (County) Denver, CO 80204   (Denver County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $900,000 to $1,100,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This is a Sanitary Sewer Project regarding deteriorated gravity drained sewer pipes. This Lining Project is located in the Lincoln Park Neighborhood north of 12th Avenue with an Add Alt between 10th and 12th Avenues. This is a Sanitary Sewer Project regarding deteriorated gravity drained sewer pipes, designed for use of Wastewater Management Division approved, Cured-In-Place-Plastic Pipe or Formed-In-Place Pipeliner Methods of Construction, which are methods of sewer pipe rehabilitation that are cost effective and consistently allow significantly shorter construction time in comparison to open trench method of construction. Since minimal excavation is required, utilities and traffic conflicts are minimized, thereby citizen discomfort and complains are reduced to minimum. This Lining Project is located in the Lincoln Park Neighborhood north of 12th Avenue with an Add Alt between 10th and 12th Avenues.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents