Similar Projects
Pavement Milling and Ultra-Thin Bonded Wearing Course
Bidding
Caribou, New Sweden, Woodland, ME

Asphalt Street Paving 2021
Bidding
Houlton, ME

Paving Project
Post-Bid
Mapleton, ME

Roads Grading/Street Sweeping/Heating
Post-Bid
Island Falls, ME

Hodgdon High School Paving Project
Results
Hodgden, ME 04730

Road Work on Sly Brook Road
Results
Eagle Lake, ME

Road Paving
Post-Bid
Saint Agatha, ME

Pavement Milling and Hot Mix Asphalt Overlay/Project is Located in Mars Hill on US Route 1 Beginning 0.01 Mile North of the US Route 1A Intersection and Extending North 1.57 Miles
Results
Less than $505,000 est. value
Mars Hill, ME 04758

Asphalt Street Paving 2020
Post-Bid
Houlton, ME

Crack Sealing
Results
ME

Paving of Three Streets
Post-Bid
Westfield, ME

Pavement Milling, Hot Mix Asphalt Overlay with Drainage and Safety Improvements
Results
ME

Airport Crack Sealing/Repair Project
Post-Bid
Less than $23,500 est. value
Presque Isle, ME

Pavement Milling, Hot Mix Asphalt Overlay, and Ultra-Thin Bonded Wearing Course
Results
Blaine, Bridgewater, Caribou, Monticello, ME 04734

2021-2022 Town Paving Projects
Term Contract
Post-Bid
Madawaska, ME

Last Updated 03/25/2021 04:51 AM
Project Title

(LCP) Light Capital Paving

Physical Address View project details and contacts
City, State (County) Caribou, Hamlin, Limestone, New Sweden, Stockholm, Van Buren, ME   (Aroostook County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $615,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work Consists of Light Capital Paving and other Incidental Work. Total Length is 13.72 miles The Work Includes Construction, Maintenance During Construction, Warranty As Provided In The Contract, And Other Incidental Work. Furnishing All Supervision, Labor, Equipment, Tools Supplies, Permanent Materials And Temporary Materials Required To Perform The Work Including Construction Quality Control Including Inspection, Testing And Documentation, All Required Documentation At The Conclusion Of The Project, Warranting Its Work And Performing. Map ID 1 is in Hamlin and Van Buren on Route 1A beginning 0.12 miles southeast of the intersection with the Soucy Road and extending northeasterly to the northerly intersection with Route 1. Includes paving shoulders. Map ID 2 is in Connor Twp. and Caribou on the Madawaska Road and the Nebraska Road beginning on the Madawaska Road at the intersection with the Beaulieu Road and extending southerly to the intersection with the Nebraska Road, then continuing easterly on the Nebraska Road 0.39 miles. Map ID 3 is in Limestone on the Albert Road and the Mill Road beginning on the Albert Road at the intersection with Route 89 and extending northerly to the intersection with the Mill Road, then continuing easterly on the Mill Road to the intersection with Route 1A. Map ID 4 is in Stockholm, New Sweden, and Connor Twp. on Lake Street, Main Street, School Street and the Jemtland Road beginning on Lake Street at the intersection with Route 161 and extending northeasterly to Main Street, then continuing northerly on Main Street to School Street, then continuing southeasterly on School Street to the Jemtland Road, then continuing southeasterly on the Jemtland Road to the intersection with Route 1. Includes paving shoulders.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents