Similar Projects
Patching, Milling and Resurfacing of Various Roads
Infrastructure
Bidding
Douglasville, GA

Deep Patching, Chip Seal And Resurfacing Of 31.7 Miles Of County Roads
Post-Bid
Greensboro, GA

Road Widening
Infrastructure
Post-Bid
GA

Bell Road at Cauley Creek Park/Old Homestead Trail Roundabout Project
Results
Less than $778,458 est. value
Johns Creek, GA

Thompson Mill Road Roadway Improvement
Results
Lawrenceville, GA 30024

Civil and Paving Multiple Award Construction Contract
Term Contract
Post-Bid
Less than $95,000,000 est. value
Camp Lejeune, NC

FY21 Milling and Resurfacing and Pavement Preservation
Results
Alpharetta, GA

Repaving at Middle School
Infrastructure
Post-Bid
Eastman, GA 31023

2021 Road Patching Project
Results
Johns Creek, GA 30097

T32-D3-PavPres-Harris GA208-131265
Infrastructure
Post-Bid
GA

LMIG Project
Results
Less than $101,363 est. value
Dahlonega, GA

Pavement Evaluations for Interstate Maintenance
Alteration
Post-Bid
$25,000 est. value

13.219 Miles of Milling, Inlay, Plant Mix Resurfacing and Shoulder Rehabilitation on SR 72 Beginning at SR 17 and Extending to The South Carolina State Line
Results
GA

Patching of 6 Roads
Results
Less than $33,565 est. value
Hamilton, GA

T32-D6-Ppv-Crack Seal-A1-115640
Results

Reported 04/21/2022 12:00 AM
Project Title

Rabun County Roads Project

Physical Address View project details and contacts
City, State (County) Clayton, GA   (Rabun County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Project consists of a total project length of 3.35 miles. Hollifield Connector: A total of .85 miles. To start at the intersection of Old 441 and end at Highway 441. Davis Gap: A total of .65 miles. To start at the intersection of Bridgecreek Road and end at Highway 76. Seedtick Road: A total of 1.5 miles. Start at the intersection of Highway 441 and end at the 1.5 mile mark. MJ Shirley Road: A total of .35 miles. Start at the intersection of Seedtick Road and end at Highway 441.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents