Similar Projects
Hickory Village at Lake Gentry
New Construction, Infrastructure
Conception
$212,400,000 CJ est. value
Saint Cloud, FL 34772

RFP Engineering - SR 500 / US 192 From I-95 to SR 507 ( Babcock St )
Infrastructure
Conception
$14,592,967 CJ est. value
Kissimmee, FL 34744

Nolte Road Commercial Park Master Plan
New Construction
Design
Saint Cloud, FL 34772

Storcon Self-Storage Facility
New Construction, Infrastructure
Design
$5,000,000 CJ est. value
Buena Ventura Lakes, FL 34743

RFQ Construction Manager at Risk for the NeoCity Academy Phase 2 Project
Renovation
Bidding
$18,673,393 CJ est. value
Kissimmee, FL 34744

Industrial Lane Distribution Center Building 100 and 200
New Construction, Infrastructure - 281,218 SF
Bidding
Poinciana, FL 34758

LDS St Cloud Meetinghouse - Parking Lot Expansion
Infrastructure - 50,450 SF
Sub-Bidding
$100,000 CJ est. value
Saint Cloud, FL 34772

Harmony High School Secure Administration Lobby Renovation
Renovation
Post-Bid
Saint Cloud, FL 34771

O'Reilly Auto Parts / Kissimmee
New Construction, Infrastructure - 7,500 SF
Post-Bid
$300,000 CJ est. value
Kissimmee, FL 34746

Site Work Contractor Services
Term Contract, Alteration
Results
FL

OTECH Welding Additional Construction Services
New Construction
Results
Kissimmee, FL 34744

Osceloa County Frito-Lay Fulfillment Center
New Construction, Infrastructure - 355,000 SF
Pending Verification
$180,000,000 CJ est. value
Kissimmee, FL 34758

Bellalago Pod G Townhomes
New Construction, Infrastructure - 3,422 SF
Pending Verification
$40,000,000 CJ est. value
Kissimmee, FL 34746

Harmony Neighborhoods C-1 and C-2 Roadway Rehabilitation
Infrastructure
Design
$2,000,000 CJ est. value
Saint Cloud, FL 34769

Lazy Dog Restaurant / Kissimmee
New Construction, Infrastructure - 11,003 SF
Bidding
$2,800,000 CJ est. value
Kissimmee, FL 34747

Last Updated 09/02/2022 06:33 PM
Project Title

RFQ Construction Manager at Risk - Saint Cloud High School Wing Addition

Physical Address View project details and contacts
City, State (County) Saint Cloud, FL 34769   (Osceola County)
Category(s) Education, Heavy and Highway
Sub-Category(s) Middle/Senior High School, Site Development
Contracting Method Construction Management - CM at Risk, Competitive Bids
Project Status Bidding, Request for Qualifications, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $7,600,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

This document shall serve to provide interested parties with specific information as to the Procedures for Selection of a Construction Management Firm where the method of compensation is a Negotiated Fee on a Guaranteed Maximum Price. Pursuant to Chapter 1013, Florida Statutes, the Florida Consultant's Competitive Negotiation Act, Section 287.055 Florida Statutes, and Rule 6A-2.0010, Florida Administrative Code, the School District of Osceola County, Florida will consider the contracting of one (1) firm to provide construction management services for the project described below. Submit questions to: Cheryl Hood, Supervisor of Purchasing Purchasing Department Email: cheryl.hood@osceolaschools.net Fax #407-870-4616 Question End Date 9/12/2022 12:00 PM Bid Bond Required Yes In determining whether a firm is qualified, the School District of Osceola County, Florida shall consider such factors as supporting office location(s), experience and past performance, proposed project staff and functions, project approach, workload, scheduling methodology, and references. The overall Scope of Work for the Project is designed by C.T. HSU + Associates, P.A. This Includes a custom wing addition to Building 3 and additional parking areas. The wing addition will provide a minimum of nineteen (19) additional classrooms, with associated improvements needed to comply with building code and SREF requirements. Tilt-up concrete panels designed to high performance building criteria to achieve school district requirements of 25 or less Energy Use Intensity (EUI) and a 0.20 CFM/SF maximum air leakage, is the form of construction for this addition. The project will include a mock-up structure, which will be determined at a later date, to facilitate testing of the building envelop prior to construction of the wing addition taking place. If possible, a portion of the new addition will be used as a test mock-up to implement construction cost savings. Building 3 will remain in operational use during construction, requiring the construction site to maintain a secure perimeter for the duration. A number of West wing classrooms on each floor are required to be inoperable for reduction of noise and construction control. All Existing west wing means of egress will remain in use during construction for Building Code compliance. As Student Stations increase, on-site parking will require reconfiguration as well for additional spaces. Currently, portables are located in student parking spaces. These portables will remain until building 3 addition is complete. In conjunction with the existing parking count, designated site grass areas will turn into parking space to meet the necessary requirements. PROJECTED DESIGN SCHEDULE Design: August 2, 2022- April 30, 2023 The construction management firm will be responsible for the successful, timely, and economical completion of the Project. The construction management firm's services may include, but are not limited to the following: Enter an "At Risk" contract with all sub-contractors, materials suppliers and equipment suppliers necessary for the construction of the project. Employ competent Project Managers, Project Superintendents, and necessary assistants to be the Construction Manager's representatives, and who shall be in attendance at the project site full time during the progress of the Work. New buildings will be constructed to meet the High-Performance Building Criteria to achieve an Energy Use Intensity (EUI) requirement of 25 or less and a building envelop Air Leakage (infiltration and exfiltration) maximum of 0.25 CFM/SF. Although the renovated buildings are not required to meet the same high-performance requirements as new buildings, there is an expectation for energy efficiency Provide preconstruction services as directed by the Owner's Project Representative during the design phases of the work, and provide cost estimating, schedule development, timely document review, existing infrastructure evaluation expertise, permit request and administration, and other related administrative items necessary to ensure the timely delivery of the project. The Owner has set an Owner Direct Purchase Goal of 20% for Renovation Projects and 30% for New Construction. The Construction Manager is to make every effort to meet or exceed the Owner's expectation for this goal. The Construction Manager must also work with its subcontractors, sub-subcontractors, and material suppliers to ensure there is a streamlined process in place to maximize discounts offered for prompt payment of items purchased through the Owner Direct Purchase Program. The Construction Manager, if requested by the Owner's Project Representative, shall provide a preliminary evaluation of the Owner's Project program and budget. Provide continuous on-site construction management services through the completion of the project to include, but not be limited to: a. Schedule and conduct preconstruction meetings and regular job site meetings. b. Maintain daily on-site project logs and schedule reports. c. Oversee quality assurance testing and inspection programs. d. Monitor construction management staff and subcontractor work performance for deficiencies. e. Maintain record copy of all contract documents, RFIs, ASIs, change orders and other project-related documentation. f. Oversee construction management staff and subcontractor safety programs. Develop, update, and maintain master project schedules, detailed construction schedules, submittal schedules, inspection schedules and occupancy schedules. Provide construction program accounting and reporting to the Owner's Project Representative. Report potential budget and schedule variances and prepare recovery plans. Work with and coordinate activities with any third-party contracts or contractors that the Owner provides for the project. Coordinate surveyors, special consultants, and testing lab services contracted by the Owner, as required. Develop and administer a Warranty Implementation Plan. Administer post construction closeout, start-up and transition to operation. Schedule, coordinate and participate in a walk-through inspection of the Work one month prior to the expiration of the one-year correction period, and notify the Owner's Project Representative, the appropriate Architect, and any necessary subcontractors and suppliers of the date of, and request their participation in, the walk-through inspection. Work with the architect of record and the Owner's Project Representative when submitting the various documents required for review, which includes but is not limited to Change Orders, Contingency Transfers, Buyout Transfers, Applications for Payment, and Certificates of Substantial Completion and Certificates of Final Inspection. The Construction Manager shall cooperate at all times with the Owner's Project Representative and shall cooperate and coordinate with any audit agency or audit firm contracted by the Owner.

Details

Division 03 - Concrete, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances and Storefronts, Windows, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents