Similar Projects
PA143 over Trib Maiden Creek
Infrastructure
Conception
$903,400 est. value
PA

Us 22/322 Pm
Infrastructure
Conception
$2,850,000 est. value

Donat Road over Stoney Run
Renovation, Infrastructure
Design
$1,565,900 est. value
PA

Weavertown Road Bridge
Demolition, New Construction, Infrastructure
Design
$4,053,900 CJ est. value
Douglassville, PA 19518

Guide Rail Improvements - Bridges 21A and 49C
Infrastructure
Bidding
$200,000 CJ est. value
Reading, PA 19601

2021 Seasonal Paving Materials
Post-Bid
Sinking Spring, PA

Road Improvement of Oil and Chip
Post-Bid
Elverson, PA

222 Slab Stabilization
Results
$5,000,000 to $7,499,999 est. value
PA

SR 2009 Resurfacing
Results
$2,500,000 to $4,999,999 est. value
PA

Reading NS RRX Corridor
Infrastructure
Conception
$1,185,828 CJ est. value
Wyomissing, PA 19610

Forgedale Road Bridge
Demolition, New Construction, Infrastructure
Design
$2,262,915 CJ est. value
Wyomissing, PA 19610

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

2021 Roadwork Projects
Results
Sinking Spring, PA 19608

SR 4040 (Old Route 22) over Trib to Northkill Crk
Alteration
Design
$1,199,665 est. value
PA

2021 Annual Paving Project
Term Contract
Post-Bid
Blandon, PA

Last Updated 09/13/2022 12:40 AM
Project Title

Club Road 2022

Physical Address View project details and contacts
City, State (County) Upper Tulpehocken Township, PA 19507   (Berks County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected May 2022
Bids Due View project details and contacts
Estimated Value $198,991 [brand] Estimate
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

For third class cities the bid must be accompanied by a certified check or bid bond in the amount of 10 % of the bid, made payable to the municipality. For other municipal types it is the discretion of the municipality. A performance bond or certified check in the amount of 100% of the contract shall be furnished by the successful bidder within 20 days after the contract is awarded. CLARIFICATION DEADLINE - 4/7/2022 3:00 PM Liquidated damages apply at the rate of $ 850.00 per calendar day. Proposals must be upon the forms furnished by the Municipality. The Municipality reserves the right to reject any or all proposals. Cold in Place recycling 5" compacted depth as per PennDOT PUB 408 Current Edition Section 341 2.1.5" 9.5mm 0-.3 ESALS WMA PG-64-22 SRL "M" as per PennDOT PUB 408 Current Edition as required. Soft and Yielding Repair (If Needed) excavate and remove material to 12" depth. Replace with 12" 2a compact as per pub 408 and 4" 19mm 0-.3 ESALS PG-64-22 SRL "L".

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents