Similar Projects
Riverside Water Treatment Plant Train 1 - Clarifier Replacements
New Construction
Bidding
Elgin, IL 60123

Water Treatment Plant No. 2 and Well No. 3
New Construction
Bidding
Pingree Grove, IL

Wastewater Treatment Facility - Phase 2A Rehabilitation
New Construction, Infrastructure
Sub-Bidding
Batavia, IL

Water Treatment Plant
Renovation
Post-Bid
Effingham, IL 62401

WPCF Digester Rehabilitation
Post-Bid
Glendale Heights, IL 60139

Water Reclamation Center Dewatering System Improvements
Results
$2,000,000 est. value
Carol Stream, IL 60188

Water Treatment Plant Improvements Pre-Design Study
Renovation
Results
Bloomington, IL

Core & Main building
New Construction - 12,000 SF
Pending Verification
$1,000,000 to $5,000,000 CJ est. value
Washington, IL

Du Quoin Clarifier Rehabilitation
Renovation
Bidding
$85,000 est. value
Du Quoin, IL

Water Treatment Program
Term Contract
Post-Bid
Glen Ellyn, IL 60137

Water Reclamation Facility Phase 2B Improvements
Results
$8,100,000 est. value
Bloomingdale, IL 60108

Design-Build Services for South Slope WWTP Controls Improvements
Renovation
Post-Bid
Moline, IL 61265

Water Treatment Plant Filter Recoating and Media Replacement
Results
Less than $648,110 est. value
Effingham, IL

Argonne Utilities Upgrades (Au2) Phase 1 Design
New Construction - 50,000 SF
Post-Bid
$95,000,000 to $105,000,000 est. value
IL

Southern Illinois University - Edwardsville, Madison County Improve Water Treatment Plant Sand Filter
Results
Less than $900,000 est. value
Edwardsville, IL 62026

Last Updated 12/15/2021 05:16 PM
Project Title

River Intake Bar Screen 2 Replacement

Physical Address View project details and contacts
City, State (County) Elgin, IL 60123   (Kane County)
Category(s) Sewer and Water
Sub-Category(s) Water Treatment Plant
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project includes, but is not limited to all labor, material, and equipment necessary to demolish, remove, and dispose of one (1) existing bar screen, two (2) pumps and two (2) slide gates within the West intake channel; and furnish and install one (1) bar screen, two (2) slide gates, two (2) pumps; install owner provided stop log assembles in the existing frame guides; electrical work; site restoration; and all other duties and activities necessary to carry out the construction.

Details

Water Treatment Plant, Renovation.
Division 01 - General Requirements.
Division 02 - Existing Conditions, Geotechnical Investigations, Subsurface Drilling and Sampling.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exterior Lighting.
Division 40 - Process Integration, Water Process Piping, Instrumentation and Control for Process Systems.
Division 46 - Water and Wastewater Equipment, Common Work Results for Water and Wastewater Equipment, Water and Wastewater Preliminary Treatment Equipment, Water and Wastewater Chemical Feed Equipment, Water and Wastewater Clarification and Mixing Equipment, Water and Wastewater Secondary Treatment Equipment, Water and Wastewater Advanced Treatment Equipment, Water and Wastewater Residuals Handling and Treatment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents