Similar Projects
Cayce 5-4 Roof Replacement
Alteration
Bidding
Nashville, TN 37206

City Hall Roof Repair or Replace
Bidding
Harrogate, TN 37752

Roofing Repair and Maintenance
Post-Bid

Roofing Repair and Maintenance
Post-Bid

AFICC Enterprise Wide Roofing Repair, Replacement, and Maintenance (R3M)
Results

AFICC Enterprise Wide Roofing Repair, Replacement, and Maintenance (R3M)
Results

Partial Re-Roofing
Renovation - 20,758 SF
Bidding
$100,000 to $300,000 est. value
Briceville, Clinton, TN 37710

Partial Re-Roof for Highland Elementary School
Renovation
Post-Bid
Greeneville, TN 37745

MATOC - Army Reserve National Roofing Program (NRP)
Results
Less than $95,000,000 est. value

Roofing Replacement at the Cannon County Senior Center
Bidding
$25,000 to $40,000 est. value
Woodbury, TN 37190

Camden Central HS Reroofing & HVAC
Post-Bid
Camden, TN 38320

UT Martin Somerville Center Roof Removal & Replacement
Renovation
Results
$70,000 est. value
Somerville, TN 38068

Strange Music Building Roof Replacement
Bidding
$300,000 est. value
Nashville, TN 37209

Big Sandy High School - Reroofing and HVAC
Post-Bid
Big Sandy, TN 38221

Roof Replacement on Bradford Elementary School
Results
Bradford, TN 38316

Reported 05/14/2021 12:00 AM
Project Title

Malesus Elementary School Roof

Physical Address View project details and contacts
City, State (County) Jackson, TN 38301   (Madison County)
Category(s) Single Trades
Sub-Category(s) Roofing
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

60 mil Sure-Weld TPO adhered with Sure-Weld bonding adhesive or CAV-Grip III adhesive/primer. The Bid winner should schedule the work to begin no later than six weeks after the official award of the bid. JMCSS realizes specific supply chain shortages do exist. If specific supply shortage issues affect the start date, the awardee should provide documentation verifying the delay. Insulation: Minimum start of 1-1/2" 20psi 'A" per foot tapered InsulBase Polyisocyanurate attached to the roof deck with Gyp-Tec fasteners a Gyp-Tec insulation plates per 4x4 board. Roof Deck: Tectum roof deck with the existing roofing assembly removed Existing Flat Roof Requirements (3,800 sq. feet). Tear off existing roof and insulation down to the deck. Install 1-1/2 Ployiso insulation base layer, per manufacturer's specifications. Install 1/4 taper insulation, minimum start 1/2" sloping to all four sides. Taper insulation to be installed per manufacturer's specifications. Install 60 mil TPO fully adhered roofing system. Provide a minimum 20 year warranty with 72mph wind speed coverage. Re-flash all penetrations per manufacturer's specifications. Install wood blocking per manufacturer's specifications. Remove all job related debris. Existing shingled Roof Requirements (2,300 sq. feet). Tear off shingle down to deck. Install wood lathing to install new 24 gauge pre-finished standing seamed panels Install all trim metal to tie into new PTO roof system. Provide a minimum 20 year finish warranty. Remove all job related debris Warranty. Provide Customer with a minimum 20-year manufacturer's NDL warranty that includes a 72 mph wind rider.

Details

Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents