Similar Projects
Concrete Sidewalk Grinding Services
Term Contract
Post-Bid
Chattanooga, TN 37402

Way Widening
Post-Bid
Chattanooga, TN 37400

Caine Lane Greenway
Results
Less than $712,713 est. value
Chattanooga, TN 37400

South Chickamauga Creek Greenway - Youngstown Connector
Results
Less than $1,913,913 est. value
Chattanooga, TN

Micro Sealing and Resurfacing Treatment Services
Term Contract
Post-Bid
Chattanooga, TN 37404

UTC West Campus Housing Pedestrian Plaza
Results
Chattanooga, TN

2019 Citywide Resurfacing Contract
Post-Bid
Chattanooga, TN 37402

Intersection Loop Replacement
Term Contract
Results
Chattanooga, TN 37402

Milling and Resurfacing of Two Existing Roadways
Post-Bid
Chattanooga, TN 37400

The Improvement of the Intersection on US 11 (US 64, SR 2)
Results
TN

Mill and Pave City Streets
Post-Bid
Collegedale, TN 37315

South - Regional Construction MATOC
Results
$500,000 to $1,000,000 est. value

In-Place Hot Mix Asphalt Services
Term Contract
Post-Bid
Chattanooga, TN 37404

Longitudinal Joint Stabilization on Various State Routes
Results
TN

FY20 Sidewalks Contract
Post-Bid
Chattanooga, TN 37402

Reported 05/11/2021 12:00 AM
Project Title

Pioneer Park Paving

Physical Address View project details and contacts
City, State (County) Atoka, TN   (Tipton County)
Category(s) Heavy and Highway
Sub-Category(s) Landscaping, Paving/Reconstruction, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Town of Atoka invites sealed bids from qualified companies to repair and pave the Pioneer Parking Lot and gravel section of the Pioneer Walking Trail. The bid should include associated vegetation matter removal, clearing, cleaning, grading, any necessary saw cutting, subgrade preparation, base installation, and all labor, materials, and equipment required to perform the work

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings, Irrigation, Planting Irrigation, Planting, Planting Preparation, Soil Preparation, Landscape Grading.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents