Similar Projects
Mesa High School Elevator Modernization
Renovation
Bidding
Mesa, AZ 85204

Job Order Contracting
Renovation
Bidding
Tempe, AZ

Paradise Honors Classroom Building
New Construction
Post-Bid
Surprise, AZ 85388

Tempe Academy Campus Rebuild - GMP2
New Construction, Renovation, Demolition - 55,451 SF
Post-Bid
$10,500,000 est. value
Tempe, AZ 85282

Weatherization Project at Highland High School
Results
Less than $441,604 est. value
Gilbert, AZ 85296

Build a New High School #7
New Construction
Results
Less than $22,124,889 est. value
Chandler, AZ

Greenhouse Montessori - Classroom Building
New Construction - 3,870 SF
Construction
$500,000 est. value
Gilbert, AZ 85296

NCHS Performing Art Center Renovations and Improvements
Renovation
Post-Bid
$8,000,000 est. value
Phoenix, AZ 85024

Job Order Contracting for General Contractors
Results
AZ

Mountain View Elevator Modernization
Renovation
Post-Bid
Mesa, AZ 85213

A New High School
New Construction
Results
$22,500,000 est. value
Maricopa, AZ 85138

Building Weatherization at Westwood High School
Post-Bid
Mesa, AZ 85201

Classroom Building Additions at Tonopah Valley High School
Addition - 15,000 SF
Results
$4,800,000 est. value
Tonopah, AZ 85354

CMAR Gililland Middle School
Renovation
Post-Bid
$38,000,000 est. value
Tempe, AZ 85281

Millennium HS Gymnasium and Campus Renovations
Renovation
Results
Goodyear, AZ 85395

Reported 07/22/2020 11:50 AM
Project Title

Restroom Renovations at North High School

Physical Address View project details and contacts
City, State (County) Phoenix, AZ 85014   (Maricopa County)
Category(s) Education
Sub-Category(s) Middle/Senior High School
Contracting Method
Project Status Construction Complete as of
Bids Due View project details and contacts
Estimated Value $1,085,889
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This portion includes the renovation of 38 existing restrooms throughout the North High School Campus. No additional area has been added to the existing buildings and no restrooms have changed in floor area size. This tenant improvement consists of new flooring, wall finishes, paint, and replacement of plumbing fixtures, light fixtures, and bathroom partitions. The project also includes accessibility upgrades of selected single occupancy restrooms. This tenant improvement will also consist of new flooring, wall finishes, paint, plumbing fixture, and light fixtures in those restrooms.

Details

1 Middle/Senior High School, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents