Similar Projects
Last Updated | 05/15/2019 12:51 PM |
Project Title | Repairs and Emergency Services for Water Distribution, Wastewater Collection and Storm Water Utility System |
Physical Address | View project details and contacts |
City, State (County) | Boynton Beach, FL (Palm Beach County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Sanitary Sewers, Storm/Sewers, Water Lines |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | Municipal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Contractors to demonstrate specific experience in utility system general repairs and emergency services. The contractor shall furnish, install and provide all labor and materials to complete repairs to the City's utility systems. Repairs will be made to the City's Water Distribution, Wastewater Collection and Storm Water Systems and generally consist of, but are not limited to, furnishing and installing various sizes of C-900 PVC pipe for gravity sewer main; ductile iron pipe for force main and water distribution lines; various types of pipe for storm water conveyance; and concrete structures for the wastewater and storm water systems. Set up and monitoring of bypass pumping; dewatering systems; and restoration related to landscaping, asphalt and concrete work may also be required as needed. The work shall be performed at various locations throughout the City of Boynton Beach and surrounding service areas. | ||||
Details |
|
||||
Bidder's List | View project details and contacts | ||||
Prospective Bidders | View project details and contacts | ||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |