Similar Projects
Steel Water Storage Tank
Infrastructure
Bidding
Phoenix, AZ

Landfill Diesel Fuel Tank Replacement Project
Infrastructure
Results
Casa Grande, AZ 85193

CNG Gas Detection System Replacement
Infrastructure
Post-Bid
Phoenix, AZ

Airport Fuel Farm Improvements
Results
Casa Grande, AZ 85122

AJO Way Fueling Facility Refurbishment
Results
$692,400 est. value
Tucson, AZ 85713

Gas Line Installation at Taylor Junior High
Results
Mesa, AZ 85204

Gasoline and Diesel Fuel Supply - Offsite Refueling Station
Post-Bid
Cottonwood, AZ

East Delos Regulator Station Replacement Project
Post-Bid
Willcox, AZ 85643

Landfill Diesel Fuel Tank/Concrete Pad Replacement Project
Alteration
Results
Casa Grande, AZ 85193

J065--Medical Gas System Repair Services for The Phoenix VA Health Care System (PVAHCS)
Term Contract
Post-Bid
Phoenix, AZ 85012

Ina Road Fueling Facility Refurbishment
Results
$1,177,600 est. value
Tucson, AZ 85743

Api 653 Internal Inspection and Tank Cleaning - Davis Monthan
Term Contract
Bidding
Tucson, AZ 85707

Water and Wastewater Treatment Chemicals
Term Contract
Post-Bid
Phoenix, AZ

Sedona Airport Fuel Farm Relocation Project
Infrastructure
Post-Bid
Sedona, AZ

Last Updated 03/29/2022 02:25 PM
Project Title

Fuel Station Maintenance (Liquified Natural Gas) -

Physical Address View project details and contacts
City, State (County) Grand Canyon, AZ   (Coconino County)
Category(s) Sewer and Water
Sub-Category(s) Fuel/Chemical Tanks and Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Contractor must perform at least the following tasks 1.Conduct safety walk-through inspections. Document any deficiencies that are found. Resolve or repair deficiencies immediately and document such repairs. 2.Perform leak inspections on all process piping. Resolve or repair deficiencies immediately and document such repairs. 3.Drain moisture from vent stack 4.Inspect fill and vent hoses. Check for leaks, damage, and wear (loose braid conditions). Repair or replace as necessary. 5.Inspect all dispenses (CNG and LNG) for leaks and malfunctions. Repair as necessary. 6.Ensure there is an adequate amount of Mercaptan in the Odorant Tank. Fill as necessary. 7.Inspect high pressure pump seals, ensure pump is operating, has oil, and inspect the belts. 8.Inspect valves, piping, and tanks for leaks and malfunctions. Repair as necessary. 9.Inspect air compressor belts. Check compressor oil level. Add oil and replace worn belts if necessary. 10.Inspect dispenser ground clamp. Repair or replace any missing or damaged parts as necessary. 11.Inspect fuel nozzles for damage, leaks, and excessive wear. Repair as necessary. 12.Drain air compressor tank and/or water separator. 13.Inspect LNG tanks for signs of corrosion. Repair as necessary and check plugs and fittings on vent stack. 14.Ensure fire extinguishers are charged and functional. 15.Perform visual inspection of entire station for leaks. Repair as necessary. 16.Clean dispenser blower motor filters. 17.Clean LNG Control Panel Air Conditioner Air Filter. 18.Function check all valves (manual and automatic), Electronic Controls, Pneumatic Controls, Temperature Controls, and ESD Switches. Replace or repair inoperable or malfunctioning items. 19.Ensure Sump Pump is operating. Remove any debris from drain. Repair as necessary. 20.Check plugs and fittings on vent stack. Repair or replace as necessary. 21.Replace air dryer filter elements and desiccant cartridges. Blow instrument air lines. 22.Inspect CNG Odorant system. 23.Visually inspect Safety Relief Valves. Replace damaged or blown safety relief valves. 24.Purge air lines of all water. 25.Inspect station ground circuit. Repair as necessary. 26.Calibrate Methane and Fire Detection System and check operation of ESD system. 27.Inspect oil in LCNG pump, change if necessary. Refer to attached O&M Manual for correct oil. 28.Perform facility housekeeping tasks such as cleaning, touch-up paint, and replacement of light bulbs as needed. 29.Replace any signage as necessary. 30.Inspect LNG tank and CNG storage tanks for corrosion/rust. 31.Unless covered by warranty as part of the fuel station upgrade, perform any quarterly maintenance tasks associated with the new equipment installed as outlined in Section g. (refer to attached O&M manual and warranty letter).

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents