Similar Projects
IR 90 Slide Repair
Infrastructure
Design
$500,000 CJ est. value
Madison, OH 44057

Pinecone Drive Industrial Addition
Addition, Demolition, Infrastructure - 19,000 SF
Design
$10,000,000 CJ est. value
Mentor, OH 44060

US 20 - Major Reconstruction
Infrastructure
Bidding
$59,125,000 CJ est. value
Perry, OH 44081

Fairport Harbor Exempted Village School District/New PreK-12 School - Early Site Package
New Construction, Infrastructure
Bidding
$50,000,000 CJ est. value
Fairport Harbor, OH 44077

Overlay Bridge Deck W/modified Pcc - Elbys Br O/l
Infrastructure
Post-Bid
$600,000 CJ est. value
Triadelphia, WV 26059

Cart Path Paving
Infrastructure
Post-Bid
$250,000 CJ est. value
Wickliffe, OH 44092

Trunk Sewer Rehabilitation Phase II Improvement
Infrastructure
Results
$1,481,185 CJ est. value
Painesville, OH 44077

Lake County Probate Court - Garage Addition
Addition, Demolition, New Construction, Infrastructure
Results
$450,000 CJ est. value
Painesville, OH 44077

Chick-fil-A / Willoughby
Infrastructure, Renovation
Construction
$5,000,000 CJ est. value
Willoughby Hills, OH 44094

Mentor Innovation & Technology Park
New Construction, Infrastructure
Pending Verification
$5,000,000 CJ est. value
Mentor, OH 44060

Pelton Road Industrial Development
New Construction, Infrastructure
Pending Verification
$2,000,000 CJ est. value
Willoughby Hills, OH 44094

Casa Rossa Cucina
New Construction, Infrastructure - 1,500 SF
Design
$457,000 CJ est. value
Kirtland, OH 44094

LAK-(CR535-0.24) Booth Road Bridge RE-BID
Infrastructure
Bidding
$510,000 CJ est. value
Kirtland, OH 44094

2022 Striping Program
Infrastructure
Post-Bid
$86,000 CJ est. value
Willowick, OH 44095

2022 Pavement Repair Program Contract A - REBID
Infrastructure
Results
$349,565 CJ est. value
Wickliffe, OH 44092

Last Updated 06/06/2023 02:37 AM
Project Title

North Park CDF Sediment & Materials Recycling Facility Phase 2

Physical Address View project details and contacts
City, State (County) Painesville, OH 44077   (Lake County)
Category(s) Heavy and Highway
Sub-Category(s) Dam/Tunnel, Site Development
Contracting Method Competitive Bids
Project Status Results, Construction start expected August 2023
Bids Due View project details and contacts
Estimated Value $1,065,083 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The work covered by the plans and specifications includes: The project includes the clearing, excavation, embankment and storm water management required to construct the dredge drying facility in accordance with the plans and specifications. All work under this contract shall be completed by December 2, 2023. The bid specifications, drawings, plan holders list, addenda, and other bid information (but not the bid forms) may be viewed and/or downloaded for free via the internet The bidder shall be responsible to check for Addenda and obtain same from the web site. Pursuant to R.C. 153.01 et. seq., the bid must be accompanied by an original sealed document in the form of a bond for the full amount (100%) of the bid, OR by a certified check, cashier's check, or irrevocable letter of credit equal to ten percent (10%) of the amount bid, drawn on a solvent bank located in Lake County and payable to Kurtz Bros., Inc., as surety that if the bid is accepted, a contract will be entered into and its performance properly secured. Should any bid be rejected said surety shall forthwith be returned to the bidder and should any bid be accepted such bid bond, certified check, cashier's check, or letter of credit will be returned to the bidder upon proper execution and securing of the contract. No bidder shall be considered lowest and best or eligible to be awarded the contract to which this Notice or Bid Specifications apply, if the bidder is listed on the Auditor of State's Database as having a "Finding of Recovery" as that term is defined in R.C. 9.24. Bids shall be subject to the conditions that the right is reserved to hold bids for a period not longer than sixty (60) days after date of bid opening and/or to award the contract at any time during said period. Contract A -Ronyak Paving, Inc.$116,083 Contract B -JTO, Inc $398,000 Contract C -CZ Landscaping $211,000 Contract D -JTO, Inc $340,000 The successful bidder will be required to execute the contract within ten (10) days after the award of the work to him/her, and he/she shall furnish acceptable bond or surety, if not filed previously to the satisfaction of Kutz Bros., Inc. for the faithful performance of said contract in the sum of one hundred percent (100%) of the total amount of the bid. In case of failure to execute the contract as stated or to furnish bond and/or surety, the bidder shall be considered to have abandoned the contract and is then liable for the difference between his/her bid and the next lowest bid, not to exceed ten percent (10%) of the amount bid. The Owner reserves the right to reject any or all bids, to waive any and all informalities, and to disregard all non-conforming, nonresponsive or conditional bids, or to increase or decrease or omit any item or items. ORC 153.011 may apply. Each bid must contain the full name of every party or all parties submitting the proposal. Each bidder must submit evidence of its experience on projects of similar size and complexity. All contractors and subcontractors shall comply with the equal employment opportunity requirements of Ohio Administrative Code Chapter 123, the Governor's Executive Order of 1972 and Governor's Executive Order 84-9. The contract shall be awarded to the lowest and best bidder. Wage Rates - Each employee employed by the contractor or any subcontractor and engaged in work on the project under this contract shall be paid prevailing wage rates for Public Improvements as provided by the appropriate Sections of the Ohio Revised Code. For further information, contact OBES Wage and Hour Division (614) 644-2239.This shall occur regardless of any contractual relationship which may be said to exist between the contractor or any subcontractor and such employee.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Shoring, Tunneling and Mining, Tunnel Excavation.
Division 35 - Waterway and Marine Construction, Dam Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents