Similar Projects
Lincoln Village Homes
New Construction, Renovation - 11,500 SF
Conception
$1,000,000 to $5,000,000 CJ est. value
Asbury Park, NJ 07712

Asbury Memorial Parkway Apartments
New Construction - 6,196 SF
Conception
Asbury Park, NJ 07712

The Heights at Monmouth Mall
New Construction, Renovation - 1,500,000 SF
Design
$500,000,000 est. value
Eatontown, NJ 07724

Ryer House Apartments
Renovation - 4,688 SF
Design
Matawan, NJ 07747

CRITICAL NEEDS REPAIRS: ADA Accessibility Upgrades Only
Renovation
Bidding
Neptune City, NJ 07753

Vacant Unit Turnover and Related Services
Post-Bid
$100,000 est. value
Asbury Park, NJ 07712

Chelsea Avenue Apartments
Renovation - 45,000 SF
Post-Bid
Long Branch, NJ 07740

Affordable Housing Developer
New Construction
Results
Long Branch, NJ 07740

Elevator Maintenance Services
Results
Lincroft, NJ 07738

The Glassworks
New Construction, Demolition - 75,000 SF
Construction
$200,000,000 est. value
Aberdeen, NJ 07721

Wayside Apartments
New Construction - 115,000 SF
Construction
Neptune, NJ 07753

Florence Avenue Mixed Use Development
New Construction
Pending Verification
Union Beach, NJ 07735

Broad Street Mixed Development
New Construction - 1,640 SF
Pending Verification
$500,000 to $1,000,000 CJ est. value
Keyport, NJ 07735

Broadway Mixed Use Development
New Construction - 48,900 SF
Conception
$5,000,000 to $10,000,000 CJ est. value
Long Branch, NJ 07740

Red Bank Corporate Plaza Residences
Renovation, Addition
Design
Red Bank, NJ 07701

Last Updated 05/06/2021 08:19 AM
Project Title

Temporary Elevators at NJ7-6 Lumley Homes

Physical Address View project details and contacts
City, State (County) Asbury Park, NJ 07712   (Monmouth County)
Category(s) Residential, Single Trades
Sub-Category(s) Apartments/Condominiums, Conveying Systems
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Temporary enclosed construction elevator shall be installed adjacent to existing stairs. For temporary elevator installation, existing windows on each stair lending shall be removed and replaced with "operating" doors. Existing stairs and main entrance door shall be used as egress exit and new signs shall be posted to follow the temporary evacuation route. During the elevator demolition and installation work, temporary elevator shall be installed for tenets use only.

Details

Division 02 - Existing Conditions, Demolition, Selective Demolition.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Joint Protection.
Division 08 - Openings, Windows.
Division 09 - Finishes, Painting.
Division 14 - Conveying Equipment, Elevators.
Division 26 - Electrical, Common Work Results for Electrical, Grounding and Bonding for Electrical Systems, Hangers and Supports for Electrical Systems, Raceway and Boxes for Electrical Systems, Identification for Electrical Systems, Low-Voltage Circuit Protective Devices, Enclosed Switches and Circuit Breakers.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents