Similar Projects
Six West
New Construction
Conception
College Park, GA

Summerhill Hotel Redevelopment
Renovation - 206,000 SF
Conception
Atlanta, GA 30312

Encore Commons
New Construction - 17,300 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Alpharetta, GA 30022

Walmart Supercenter #855-232 - SPRB-1
Renovation - 203,091 SF
Design
Union City, GA 30291

Purchase and Redevelopment of 1050 Murphy Avenue Southwest
New Construction
Bidding
Atlanta, GA 30310

Service Station
Renovation - 900 SF
Bidding
Alpharetta, GA 30022

Lululemon #15016
Renovation - 6,675 SF
Sub-Bidding
Alpharetta, GA 30009

Centennial Yards Pre-Construction Services
Post-Bid
Atlanta, GA

Walmart Supercenter #1578-604 - Capxref-2
Renovation
Post-Bid
Roswell, GA 30076

Castleberry Park
New Construction - 350,000 SF
Construction
$33,000,000 est. value
Atlanta, GA

The Hamilton, a Curio Collection by Hilton
New Construction - 93,000 SF
Construction
Alpharetta, GA

903 Peachtree
New Construction - 387,656 SF
Pending Verification
$10,000,000 CJ est. value
Atlanta, GA 30309

950 West Marietta Street - Westside Paper Mixed Use Development
Renovation - 275,000 SF
Pending Verification
Atlanta, GA

Walmart Supercenter #855-234 - Entertainment Optimization
Renovation - 203,091 SF
Design
Union City, GA 30291

Dollar General #21743
New Construction - 9,100 SF
Post-Bid
$1,000,000 to $5,000,000 CJ est. value
South Fulton, GA 30349

Reported 05/18/2021 07:43 AM
Project Title

AutoZone #4367

Physical Address View project details and contacts
City, State (County) Fairburn, GA 30213   (Fulton County)
Category(s) Commercial
Sub-Category(s) Retail
Contracting Method
Project Status Building in Operation as of May 2021
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This is also referred to as Union City, GA.

Details

1 Retail, 1 Story Above Grade, 7,147 SF New Construction.
Division 01 - General Requirements, Quality Control, Testing Laboratory Services.
Division 02 - Existing Conditions.
Division 03 - Concrete, Cast-in-Place Concrete, Lightweight Concrete Roof Insulation.
Division 04 - Masonry.
Division 05 - Metals, Structural Steel Framing, Steel Joist Framing, Metal Decking, Cold-Formed Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Exterior Insulation and Finish Systems, Membrane Roofing, Sheet Metal Flashing and Trim, Roof Accessories, Joint Sealants.
Division 08 - Openings, Metal Frames, Hollow Metal Frames, Metal Doors, Hollow Metal Doors, Wood Doors, Coiling Doors and Grilles, Overhead Coiling Doors, Storefronts, Aluminum-Framed Storefronts, Fire-Rated Aluminum Storefronts, Door Hardware, Glazing.
Division 09 - Finishes, Cement Plastering, Cement Stucco, Gypsum Board, Resilient Flooring, Resilient Tile Flooring, Interior Wall Paneling, Painting and Coating.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Toilet Accessories.
Division 11 - Equipment, Loading Dock Equipment.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical, Low-Voltage Electrical Service Entrance, Switchboards and Panelboards, Panelboards, Lighting.
Division 31 - Earthwork, Site Clearing, Erosion and Sedimentation Controls, Stabilization Measures for Erosion and Sedimentation Control, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Irrigation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents