Similar Projects
Last Updated | 04/03/2023 10:20 AM |
Project Title | 2023 Sidewalk Repair Program |
Physical Address | View project details and contacts |
City, State (County) | Brighton, NY 14618 (Monroe County) |
Category(s) | Single Trades |
Sub-Category(s) | Service/Term Contracts |
Contracting Method | Competitive Bids |
Project Status | Sub-Bidding, Construction start expected May 2023 |
Bids Due | View project details and contacts |
Estimated Value | $80,000 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The work consists principally of removal and replacement of existing sidewalk as well as new installation of sidewalk in various locations in the Town of Brighton. Bids must be made in writing on the forms furnished and shall be accompanied by a bid guarantee for an amount not less than five percent (5%) of the amount bid in accordance with the INSTRUCTIONS TO BIDDERS. The Town of Brighton is exempt under New York State Tax law, and therefore, no sales tax on the cost of materials incorporated into the project shall be included in the bid. All prices bid shall be good for a period of sixty (60) days after opening. The Town of Brighton reserves the right to consider bids for sixty (60) days after their receipt before awarding any contract. The Town of Brighton further reserves the right to reject any and all bids, and to accept any Proposal or individual item or items, which it may deem to be the most favorable to its best interests. A non-collusive bidding certificate shall be included with each bid. The attention of the Bidder is called to the requirements as to the conditions of employment and the minimum wage rates to be paid under this contract. Any unauthorized modifications or alterations to this document could result in a rejected bid. This contract will start with the date of the contract award and run for one year with the option to renew the contract up to three (3) additional twelve (12) month periods at the sole discretion of the Town of Brighton. Price changes may be proposed by the contractor no later than forty-five (45) days prior to contract extension, based upon the latest prevailing wage rates and material price change which must be supported with documentation. Should price changes not be acceptable to the Town of Brighton, the contract will not be extended. Prices may change only at time of the extension. |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |