Similar Projects
McDonald's
New Construction - 6,003 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Waxahachie, TX 75167

Joey Barraza and Vino Memorial Park Phase II
Bidding
$5,000,000 to $5,500,000 est. value
El Paso, TX 79934

Site Development, Palo Pinto Mountains State Park, Palo Pinto County
New Construction
Bidding
$3,400,000 to $3,600,000 est. value
Strawn, TX

Memorial Park Central Connector Project
Post-Bid
Less than $4,475,250 est. value
Hidalgo, TX 77056

Lakeview Pool Splash Park
Post-Bid
Port Arthur, TX 77640

Family Aquatic Center Improvements
Results
Less than $5,000,000 est. value
Conroe, TX 77301

CDBG De Llano Park Improvements
Results
Less than $369,000 est. value
Laredo, TX 78041

Water Crest On Lake Conroe Section 10 Dog Park
New Construction - 1,500 SF
Construction
Conroe, TX 77384

Velocity
New Construction - 3,795,000 SF
Pending Verification
$10,000,000 CJ est. value
Austin, TX 78617

Site Development and Visitor Check In
Infrastructure
Bidding
$3,800,000 to $4,000,000 est. value
Del Rio, TX

Lacrosse Field Construction Services
Post-Bid
Keller, TX 76248

Stone Tables Phase 2 Improvements/ White Rock Lake Park
Results
Dallas, TX 75218

Fate Downtown Park and Promenade
New Construction
Bidding
Fate, TX

Les Lacs Linear Park North Sand Volleyball Courts Refurbishment
Post-Bid
$8,500 to $10,000 est. value
Addison, TX 75254

Wright Cuney Park Playground
Results
$65,000 est. value
Galveston, TX 77550

Last Updated 06/24/2021 03:14 PM
Project Title

Dellanera Pavilion Interior Remodel

Physical Address View project details and contacts
City, State (County) Galveston, TX 77554   (Galveston County)
Category(s) Heavy and Highway
Sub-Category(s) Park/Playground
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $89,390
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The following is a summary of the major functions, features and services expected to be performed and provided. This renovation project will require work to be phased. Work in the Community Room must be complete first so that the Park Manager and the Reception/Retail area may move into the Community Room while that renovation takes place. Park operations cannot cease during the renovation project. Additionally, RV park customers must be able to access the restrooms, showers, laundry and reception/retail during the project. Demolition and renovation plan for the Community Room, Offices, Restroom and Reception/Retail are provided by EAS (Easterwood Architects Studio). They are to be used to formulate bids and no questions regarding the project shall be directed to their offices. Base Bid Items: 1. Demolition 2. Community Room Remodel 3. Kitchenette 4. Reception/Retail and Office Remodel 5. Powder Room 6. General Conditions / Soft Costs 7. Permitting 8. TAS/TDLR (if required) Specific Areas of Work: 1. Interior Demolition Work 2. Patch Ceilings & Walls to Remain (as needed) 3. Paint Entire Interior 4. Flooring 5. Wood Framed Sheetrock Walls with Baseboard 6. Commercial Interior Doors 7. Electrical, Lighting & Internet Cabling 8. Plumbing & Fixtures for Powder Room 9. Kitchenette Cabinets & Fixtures 10. Reception Desk 11. HVAC work.

Details

Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 31 - Earthwork, Selective Clearing, Grading.
Division 32 - Exterior Improvements, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents