Similar Projects
HVAC Controller Replacement
Term Contract
Design
Offutt AFB, NE

Multiple Site HVAC Controls Modernization
Renovation
Sub-Bidding
$400,000 CJ est. value
Omaha, NE 68102

Multiple Site HVAC Controls Modernization
Renovation
Sub-Bidding
$400,000 CJ est. value
Omaha, NE 68102

HVAC Upgrades Phase IV
Alteration
Post-Bid
De Witt, NE

AV Closet HVAC Central Community College Kearney Center
Alteration
Post-Bid
Kearney, NE 68845

Cooling Tower Repair B451 - Offutt AFB
Term Contract
Results
Offutt AFB, NE

West Cooling Tower Replacement
Alteration
Results
Louisville, NE

ESU 13 H.V.A.C. Upgrade Phase II
Renovation
Construction
$191,647 CJ est. value
Scottsbluff, NE 69361

Addition of Air Conditioning and Replacement of the Furnace at Our North Auditorium
Renovation
Sub-Bidding
$400,000 CJ est. value
Monroe, NE 68647

Westside High School Water Source Heat Pump Replacement Phase III
Alteration
Post-Bid
Omaha, NE 68114

Elementary Gymnasium HVAC Replacement
Alteration
Results
Louisville, NE 68037

Turn-Key Remove and Replace Medical Vacuum System Controls
Term Contract
Post-Bid
Offutt Air Force Base, NE

Rohwer Elementary School Heat Pump Replacement
Alteration
Results
Omaha, NE

McMillan MS Closed Circuit Cooling Tower Addition
Infrastructure
Post-Bid
$900,000 est. value
Omaha, NE 68112

Andersen Middle School Heat Pump Replacement - Phase I
Alteration
Results
Omaha, NE 68137

Last Updated 06/22/2023 10:02 AM
Project Title

Gering Junior High School Gymnasium & Shop Hvac Replacement

Physical Address View project details and contacts
City, State (County) Gering, NE 69341   (Scotts Bluff County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $591,000 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

The Contract Documents containing the detailed Drawings and Specifications for the construction of the work, together with the proposed construction contract, may be seen at the office of the Consulting Engineers, Baker & Associates, 120 East 16th Street-Suite A, Scottsbluff, NE 69361, (308) 632-3123. The site of the work is located at Gering Junior High. The major items of work and approximate quantities under this contract are as follows: Replacing HVAC Units and Duct Work Serving the Main Gym & Shop Areas. Any Bids received after the above specified time will be immediately returned to the Bidder unopened. Bid security in the amount of five percent (5%) unqualified of the amount of maximum Bid price shall be required with each Bid. No Bidder may withdraw his Bid within 60 days after the actual date of the opening thereof. Right is reserved in the interest of the Owner to reject any or all Bids and to waive any informality in the Bids received.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents